- 2073 Shrawan · 8 marks
Reservoir routing through spillway, 6-hr inflow
Short answer
Using the modified Puls method with Δ t=6 h, the maximum reservoir level is ≈144.15 m, maximum outflow rate ≈1442 m³/s, and reduction in peak is 688 m³/s (32.3% of peak inflow).
The ordinates of the inflow hydrograph at 6 hr interval are as follows:
| Time (hrs) | 0 | 6 | 12 | 18 | 24 | 30 | 36 | 42 | 48 | 54 | 60 | 66 | 72 | 78 | 84 | 90 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Discharge (m/s) | 0 | 50 | 280 | 610 | 1290 | 1900 | 2130 | 1900 | 1600 | 1440 | 1060 | 780 | 500 | 370 | 220 | 130 |
The discharge over the spillway crest and the surcharge storage above the crest for different water surface elevations are as follows:
| Water surface elevation (m) | 140 | 141 | 142 | 143 | 144 | 145 | 146 |
|---|---|---|---|---|---|---|---|
| Outflow discharge (m/s) | 0 | 170 | 482 | 883 | 1360 | 1905 | 2500 |
| Storage ( m) | 0.00 | 15.0 | 35.0 | 60.0 | 95.0 | 140.0 | 240.0 |
Determine: i) Maximum reservoir level, ii) Maximum outflow rate, iii) Reduction in the peak.
Use the storage-indication (modified Puls) method. The reservoir is assumed to start full to the spillway crest (elevation 140 m), so and at .
Method
Continuity over one interval : , which rearranges to
s.
Step 1: Storage-indication curve
| Elevation (m) | O (m³/s) | S (10⁶ m³) | ψ = S/Δt + O/2 (m³/s) |
|---|---|---|---|
| 140 | 0 | 0 | 0.0 |
| 141 | 170 | 15 | 779.4 |
| 142 | 482 | 35 | 1861.4 |
| 143 | 883 | 60 | 3219.3 |
| 144 | 1360 | 95 | 5078.1 |
| 145 | 1905 | 140 | 7434.0 |
| 146 | 2500 | 240 | 12361.1 |
Step 2: Routing
At each step, is computed from the right-hand side, then and are found by linear interpolation in the table above ().
| t (h) | I1 | I2 | (I1+I2)/2 | S1/Δt − O1/2 | ψ2 = S2/Δt + O2/2 | O2 (m³/s) | S2 (10⁶ m³) |
|---|---|---|---|---|---|---|---|
| 6 | 0 | 50 | 25 | 0.0 | 25.0 | 5.5 | 0.48 |
| 12 | 50 | 280 | 165 | 19.5 | 184.5 | 40.3 | 3.55 |
| 18 | 280 | 610 | 445 | 144.3 | 589.3 | 128.5 | 11.34 |
| 24 | 610 | 1290 | 950 | 460.8 | 1410.8 | 352.1 | 26.67 |
| 30 | 1290 | 1900 | 1595 | 1058.7 | 2653.7 | 716.0 | 49.59 |
| 36 | 1900 | 2130 | 2015 | 1937.7 | 3952.7 | 1071.2 | 73.81 |
| 42 | 2130 | 1900 | 2015 | 2881.5 | 4896.5 | 1313.4 | 91.58 |
| 48 | 1900 | 1600 | 1750 | 3583.1 | 5333.1 | 1419.0 | 99.87 |
| 54 | 1600 | 1440 | 1520 | 3914.1 | 5434.1 | 1442.4 | 101.80 |
| 60 | 1440 | 1060 | 1250 | 3991.8 | 5241.8 | 1397.9 | 98.13 |
| 66 | 1060 | 780 | 920 | 3843.9 | 4763.9 | 1279.4 | 89.08 |
| 72 | 780 | 500 | 640 | 3484.6 | 4124.6 | 1115.3 | 77.05 |
| 78 | 500 | 370 | 435 | 3009.3 | 3444.3 | 940.7 | 64.24 |
| 84 | 370 | 220 | 295 | 2503.5 | 2798.5 | 758.7 | 52.25 |
| 90 | 220 | 130 | 175 | 2039.8 | 2214.8 | 586.4 | 41.51 |
Results
- Peak inflow = 2130 m³/s at 36 h.
- Peak outflow occurs at t = 54 h (where the outflow curve meets the inflow curve, ).
- Storage at that time 101.8 × 10⁶ m³, which lies between 144 m (95) and 145 m (140).
Answer:
- i) Maximum reservoir level 144.15 m
- ii) Maximum outflow rate 1442 m³/s
- iii) Reduction in peak 688 m³/s (32.3 % of the peak inflow)
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Muskingum routing, K=36 hr, x=0.15 · Engineering Hydrology, chapter 7
- Flood hydrograph from 6-hr hydrograph, 3.3 and 5.5 cm · Engineering Hydrology, chapter 5
- Flood hydrograph from 6-hr UH, two storms · Engineering Hydrology, chapter 5
- Muskingum routing, K=12 h, X=0.20 · Engineering Hydrology, chapter 7 · asked 2×
- Storm hydrograph from 6-h UH, 3-hr storm · Engineering Hydrology, chapter 5 · asked 2×
- Flood hydrograph from 6-h UH, three storms · Engineering Hydrology, chapter 5
- Storage for uniform inflow over 24 hours · Water Supply Engineering, chapter 7
- Impounded reservoir, 4.78 million m3 draft · Water Supply Engineering, chapter 2 · asked 2×
- Service reservoir of 30 m diameter, 1,00,000 population · Water Supply Engineering, chapter 7
- Conductor selection, 100 MW 70 km 132 kV · Transmission and Distribution System Design, chapter 4