Muskingum routing, K=12 h, X=0.20
Short answer
Using Muskingum routing with coefficients C0=0.0476, C1=0.4286, C2=0.5238 and initial outflow 10 m³/s, peak outflow is 49.58 m³/s at 30 h. Peak inflow 60 m³/s at 18 h gives attenuation 10.42 m³/s and lag 12 h.
Route the following hydrograph through a river reach for which K = 12 h and X = 0.20. At the start of the inflow flood, the outflow discharge is 10 m/s. Also find lag of peak and attenuation.
| Time (h) | 0 | 6 | 12 | 18 | 24 | 30 | 36 | 42 | 48 | 54 |
|---|---|---|---|---|---|---|---|---|---|---|
| Inflow (m/s) | 10 | 20 | 50 | 60 | 55 | 45 | 35 | 27 | 20 | 15 |
Method
Muskingum routing: , where
Here h, , h, so h.
Check: .
Routing table
| t (h) | I | C0·I2 | C1·I1 | C2·O1 | O (m³/s) |
|---|---|---|---|---|---|
| 0 | 10.00 | - | - | - | 10.00 |
| 6 | 20.00 | 0.95 | 4.29 | 5.24 | 10.48 |
| 12 | 50.00 | 2.38 | 8.57 | 5.49 | 16.44 |
| 18 | 60.00 | 2.86 | 21.43 | 8.61 | 32.90 |
| 24 | 55.00 | 2.62 | 25.71 | 17.23 | 45.57 |
| 30 | 45.00 | 2.14 | 23.57 | 23.87 | 49.58 |
| 36 | 35.00 | 1.67 | 19.29 | 25.97 | 46.92 |
| 42 | 27.00 | 1.29 | 15.00 | 24.58 | 40.86 |
| 48 | 20.00 | 0.95 | 11.57 | 21.41 | 33.93 |
| 54 | 15.00 | 0.71 | 8.57 | 17.77 | 27.06 |
Peak attenuation and lag
- Peak inflow = 60 m³/s at t = 18 h
- Peak outflow = 49.58 m³/s at t = 30 h
- Attenuation of peak = 60 − 49.58 = 10.42 m³/s (17.4 % of the inflow peak)
- Lag of peak = 30 − 18 = 12 h (to the nearest time step)
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Muskingum routing, K=10, x=0.20 · Engineering Hydrology, chapter 7 · asked 2×
- Muskingum routing, K=36 hr, x=0.15 · Engineering Hydrology, chapter 7
- Muskingum routing at Chovar, Bagmati River · Engineering Hydrology, chapter 7
- Muskingum routing, K=8 h, X=0.25 · Engineering Hydrology, chapter 7
- Muskingum routing, k=10 h, x=0.2 (table missing) · Engineering Hydrology, chapter 7
- Reservoir routing through spillway, 6-hr inflow · Engineering Hydrology, chapter 7
- Attenuation and lag of peak in routing · Engineering Hydrology, chapter 7 · asked 2×
- Bresenham: line (20,10) to (30,18) · Computer Graphics, chapter 2 · asked 4×
- ERR from separate inflow and outflow rows · Engineering Economics, chapter 3