- 2073 Shrawan · 4 marks
Peak discharge from 6-h UH with minimum infiltration
Short answer
Rainfall excess depth = (18.3/6 − 0.25) × 6 = 16.8 cm. Peak discharge = 16.8 × 96 + 25 = 1637.8 m³/s.
A 6 h unit hydrograph of a basin has a peak ordinate of 96 m/s. When the base flow in the stream is 25 m/s, and when the basin has reached its minimum infiltration capacity of 2.5 mm/h, a 6 h storm with 18.3 cm of total rainfall had occurred on the basin. What is the magnitude of the peak discharge in the flood hydrograph produced by this storm?
Direct runoff = rainfall excess; the peak of the flood hydrograph = (ER depth in cm) × (UH peak) + base flow, because a 6 h storm on a 6 h UH needs no lagging.
Data
- UH duration = storm duration = 6 h, UH peak = 96 m³/s per cm
- Base flow = 25 m³/s
- Infiltration is at its minimum rate, so it is taken as the φ-index = 2.5 mm/h = 0.25 cm/h
Rainfall excess
Rainfall intensity = 18.3 / 6 = 3.05 cm/h
Peak discharge
Answer: peak discharge ≈ 1637.8 m³/s (direct runoff 1612.8 m³/s + base flow 25 m³/s).
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Storm hydrograph from 6-h UH, 15 cm storm · Engineering Hydrology, chapter 5 · asked 2×
- Flood hydrograph from 2-h UH, 5.2 cm rainfall · Engineering Hydrology, chapter 5
- Derive UH from storm, peak flow from two storms · Engineering Hydrology, chapter 5
- Storm hydrograph from 6-h UH, 3-hr storm · Engineering Hydrology, chapter 5 · asked 2×
- 2-hr UH and flood hydrograph from storm · Engineering Hydrology, chapter 5
- 2-h UH by S-curve from storm hydrograph · Engineering Hydrology, chapter 5
- Settling basin 25 m³/s, 0.2 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 6 m³/s, 0.25 mm, depth 3 m · Hydropower Engineering, chapter 5
- Settling basin design for 0.25 mm sediment · Hydro Power, chapter 5