- 2071 Shrawan · 6 marks
Thiessen polygon mean rainfall, pentagon catchment
Short answer
Perpendicular bisectors x=75 and y=0 divide the pentagon. Using shoelace method, polygon areas sum to 11000 km² and Σ(A_i·P_i)=1,144,218.75. Mean rainfall = 1,144,218.75/11000 = 104.0 mm.
The shape of a catchment is in the form of a pentagon ABCDE. There are 4 rain gauge stations P, Q, R and S inside the catchment. The position co-ordinates in km are: A(0,0), B(50,75), C(100,70), D(150,0), E(75,-50), P(50,25), Q(100,25), R(100,-25) and S(50,-25). If rainfalls recorded at P, Q, R and S are 90, 105, 114 and 120 mm respectively, determine the mean rainfall by Thiessen Polygon method.
Method: Draw perpendicular bisectors between neighbouring stations P(50,25), Q(100,25), R(100,-25), S(50,-25). The catchment is divided by the lines (between P-Q and S-R) and (between P-S and Q-R). Each polygon is clipped by the catchment boundary A(0,0), B(50,75), C(100,70), D(150,0), E(75,-50).
B(50,75) C(100,70)
A(0,0) P | Q D(150,0)
--------+----+---+-----------
S | R
E(75,-50)
x=75 divides left/right, y=0 upper/lower
Polygon areas (by coordinates, shoelace formula):
| Station | Polygon vertices | Area (km²) | Rain (mm) | A×P |
|---|---|---|---|---|
| P | (0,0),(50,75),(75,72.5),(75,0) | 3718.75 | 90 | 334687.5 |
| Q | (75,72.5),(100,70),(150,0),(75,0) | 3531.25 | 105 | 370781.25 |
| R | (150,0),(75,-50),(75,0) | 1875 | 114 | 213750 |
| S | (0,0),(75,0),(75,-50) | 1875 | 120 | 225000 |
| Total | 11000 | 1144218.75 |
Total area check: pentagon area km².
Answer: Mean rainfall by Thiessen polygon method = 104.0 mm.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Thiessen weights for semicircular catchment · Engineering Hydrology, chapter 2
- Thiessen average rainfall, four gauges at rectangle corners · Engineering Hydrology, chapter 2
- Empirical flood formula, 100 sq km catchment · Engineering Hydrology, chapter 6
- Optimum rain gauges for 10% error, six stations · Engineering Hydrology, chapter 2
- Additional rain gauges for 5% error, seven stations · Engineering Hydrology, chapter 2 · asked 2×
- Procedure of Thiessen mean rainfall · Engineering Hydrology, chapter 2
- Thiessen polygon method with rainfall data · Hydro Power, chapter 2
- Conductor selection, 100 MW 70 km 132 kV · Transmission and Distribution System Design, chapter 4
- Vertical curve +1.25% and +4.75%, 1267.70 m · Surveying II, chapter 6 · asked 3×
- Received power: 100 MHz, 0.75 km · Propagation and Antenna, chapter 5