- 2067 Mangsir (old course) · 16 marks
6-h UH and flood from two storms, 700 km2
Short answer
Baseflow 40 m³/s subtracted; direct runoff volume gives effective depth 5.52 cm. Scaling DRH yields 6-h UH (peak 65.2 m³/s per cm). For two successive storms 9.5 and 12.5 cm with 1.5 cm loss each, effective depths 8.0 and 11.0 cm; superposition with baseflow gives flood peak 1205.9 m³/s at 30 h.
The following are the ordinates of the hydrograph of flow from a catchment area of 700 km due to a 6-h rainfall.
| Time (Hour) | 0 | 6 | 9 | 12 | 18 | 24 | 30 | 33 | 36 | 42 | 48 | 54 | 60 | 66 | 72 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Discharge (m/s) | 40 | 65 | 140 | 215 | 360 | 400 | 350 | 330 | 270 | 205 | 145 | 100 | 70 | 50 | 40 |
a) Derive the ordinates of 6-h unit hydrograph. b) Calculate the flood hydrograph for two successive storms of 9.5 and 12.5 cm of 6 hours duration rainfall and an average storm loss of 0.25 cm/hr.
(a) Ordinates of the 6-h unit hydrograph
Base flow: the discharge is 40 m³/s at the start and at the end (t = 0 and 72 h), so a constant base flow of 40 m³/s is assumed and subtracted. Ordinates at 6-h intervals are used (the 9 h and 33 h readings are not on the 6-h grid).
Volume of direct runoff = (sum of DRH ordinates) × 6 h × 3600:
UH ordinate = DRH ordinate / 5.52 (m³/s per cm):
| t (h) | 0 | 6 | 12 | 18 | 24 | 30 | 36 | 42 | 48 | 54 | 60 | 66 | 72 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Observed Q | 40 | 65 | 215 | 360 | 400 | 350 | 270 | 205 | 145 | 100 | 70 | 50 | 40 |
| DRH = Q − 40 | 0 | 25 | 175 | 320 | 360 | 310 | 230 | 165 | 105 | 60 | 30 | 10 | 0 |
| UH (m³/s per cm) | 0.0 | 4.5 | 31.7 | 57.9 | 65.2 | 56.1 | 41.6 | 29.9 | 19.0 | 10.9 | 5.4 | 1.8 | 0.0 |
6-h UH ordinates (m³/s per cm), t = 0 to 72 h: 0.0, 4.5, 31.7, 57.9, 65.2, 56.1, 41.6, 29.9, 19.0, 10.9, 5.4, 1.8, 0.0. Check: sum × 6 × 3600 / 700 km² = 1.00 cm ✓.
(b) Flood hydrograph for two successive storms
Loss = 0.25 cm/h × 6 h = 1.5 cm in each period.
- Storm 1: 9.5 − 1.5 = 8.0 cm
- Storm 2: 12.5 − 1.5 = 11.0 cm
| t (h) | UH (m³/s) | 8 cm × UH | 11 cm × UH | Base | Q (m³/s) |
|---|---|---|---|---|---|
| 0 | 0.00 | 0.0 | 0.0 | 40.0 | 40.0 |
| 6 | 4.53 | 36.2 | 0.0 | 40.0 | 76.2 |
| 12 | 31.68 | 253.5 | 49.8 | 40.0 | 343.3 |
| 18 | 57.94 | 463.5 | 348.5 | 40.0 | 852.0 |
| 24 | 65.18 | 521.4 | 637.3 | 40.0 | 1198.7 |
| 30 | 56.12 | 449.0 | 716.9 | 40.0 | 1205.9 |
| 36 | 41.64 | 333.1 | 617.4 | 40.0 | 990.5 |
| 42 | 29.87 | 239.0 | 458.0 | 40.0 | 737.0 |
| 48 | 19.01 | 152.1 | 328.6 | 40.0 | 520.7 |
| 54 | 10.86 | 86.9 | 209.1 | 40.0 | 336.0 |
| 60 | 5.43 | 43.5 | 119.5 | 40.0 | 202.9 |
| 66 | 1.81 | 14.5 | 59.7 | 40.0 | 114.2 |
| 72 | 0.00 | 0.0 | 19.9 | 40.0 | 59.9 |
| 78 | 0.00 | 0.0 | 0.0 | 40.0 | 40.0 |
Answer: peak flood ≈ 1206 m³/s at t = 30 h (ordinates of the flood hydrograph are in the last column).
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Flood hydrograph from 6-hr UH, two storms · Engineering Hydrology, chapter 5
- Flood hydrograph from 6-h UH, three storms · Engineering Hydrology, chapter 5
- 2-hr UH from figure: area, flood, Tc, two storms · Engineering Hydrology, chapter 5
- Flood hydrograph from 2-h UH, 5.2 cm rainfall · Engineering Hydrology, chapter 5
- Flood hydrograph from 4-h UH, 50 m3/s base · Engineering Hydrology, chapter 5 · asked 2×
- Flood hydrograph from 6-hr hydrograph, 3.3 and 5.5 cm · Engineering Hydrology, chapter 5
- Sewer diameter for a 12 sq km area · Sanitary Engineering, chapter 3