Newton-Raphson (polar form) is applied to the two-bus system. The line admittance is y12=10∠−73.74∘=2.8−j9.6 pu, and the load 150 MW + j50 MVAr is 1.5+j0.5 pu on the 100 MVA base.
Bus data and Y-bus
Base 100 MVA. Bus 1: slack, V1=1∠0∘. Bus 2: load bus with P2=−1.50 pu and Q2=−0.50 pu (negative, as power is taken out). Unknowns: δ2, ∣V2∣. Flat start: ∣V2∣(0)=1, δ2(0)=0.
y12Y11Y12=10∠−73.74∘=2.8−j9.6=Y22=y12=2.8000−j9.6000=10.0000∠−73.74∘=Y21=−y12=−2.8000+j9.6000=10.0000∠106.26∘
Equations used
With Yij=∣Yij∣∠θij, Vi=∣Vi∣∠δi and ϕij=θij−δi+δj:
PiQi=j=1∑n∣Vi∣∣Vj∣∣Yij∣cosϕij=−j=1∑n∣Vi∣∣Vj∣∣Yij∣sinϕij
Jacobian elements (polar form, j=i):
∂δi∂Pi∂δj∂Pi∂∣Vi∣∂Pi∂∣Vj∣∂Pi∂δi∂Qi∂δj∂Qi∂∣Vi∣∂Qi∂∣Vj∣∂Qi=j=i∑∣Vi∣∣Vj∣∣Yij∣sinϕij=−∣Vi∣∣Vj∣∣Yij∣sinϕij=2∣Vi∣∣Yii∣cosθii+j=i∑∣Vj∣∣Yij∣cosϕij=∣Vi∣∣Yij∣cosϕij=j=i∑∣Vi∣∣Vj∣∣Yij∣cosϕij=−∣Vi∣∣Vj∣∣Yij∣cosϕij=−2∣Vi∣∣Yii∣sinθii−j=i∑∣Vj∣∣Yij∣sinϕij=−∣Vi∣∣Yij∣sinϕij
For bus 2, [ΔP2; ΔQ2]=J[Δδ2; Δ∣V2∣].
Newton-Raphson iterations
Iteration 1
Calculated powers and mismatches with the values from iteration 0:
P2(0)Q2(0)=0.0000,ΔP2=−1.5000−(0.0000)=−1.5000=0.0000,ΔQ2=−0.5000−(0.0000)=−0.5000
Jacobian elements:
∂δ2∂P2∂∣V2∣∂P2∂δ2∂Q2∂∣V2∣∂Q2=(1.0000)(1.0000)(10.0000)sin(106.26∘)=9.6000=2(1.0000)(10.0000)cos(−73.74∘)+(1.0000)(10.0000)cos(106.26∘)=2.8000=(1.0000)(1.0000)(10.0000)cos(106.26∘)=−2.8000=−2(1.0000)(10.0000)sin(−73.74∘)−(1.0000)(10.0000)sin(106.26∘)=9.6000
[−1.5000−0.5000]=[9.6000−2.80002.80009.6000][Δδ2Δ∣V2∣]
[Δδ2Δ∣V2∣]=[−0.1300−0.0900]
δ2(1)∣V2∣(1)=0.0000+(−0.1300)=−0.1300 rad=−7.4485∘=1.0000+(−0.0900)=0.9100 pu
Iteration 2
Calculated powers and mismatches with the values from iteration 1:
P2(1)Q2(1)=−1.3403,ΔP2=−1.5000−(−1.3403)=−0.1597=−0.3822,ΔQ2=−0.5000−(−0.3822)=−0.1178
Jacobian elements:
∂δ2∂P2∂∣V2∣∂P2∂δ2∂Q2∂∣V2∣∂Q2=(0.9100)(1.0000)(10.0000)sin(113.71∘)=8.3320=2(0.9100)(10.0000)cos(−73.74∘)+(1.0000)(10.0000)cos(113.71∘)=1.0751=(0.9100)(1.0000)(10.0000)cos(113.71∘)=−3.6590=−2(0.9100)(10.0000)sin(−73.74∘)−(1.0000)(10.0000)sin(113.71∘)=8.3160
[−0.1597−0.1178]=[8.3320−3.65901.07518.3160][Δδ2Δ∣V2∣]
[Δδ2Δ∣V2∣]=[−0.0164−0.0214]
δ2(2)∣V2∣(2)=−0.1300+(−0.0164)=−0.1464 rad=−8.3885∘=0.9100+(−0.0214)=0.8886 pu
i) Bus 2 voltage after the 2nd iteration
∣V2∣=0.8886 pu, δ2=−8.389∘, i.e. V2=0.8886∠−8.389∘ pu.
ii) Slack bus power and network losses
S1=P1+jQ1=V1[Y11V1+Y12V2]∗=1.5830+j0.7976 pu=158.30 MW+j79.76 MVAr
I12SlossPloss=(V1−V2)y12=1.5830−j0.7976=1.7726∠−26.7403∘ pu=S12+S21=V1I12∗−V2I12∗=0.0880+j0.3016 pu=8.80 MW,Qloss=30.16 MVAr
(The loss is found from the line current with the 2nd-iteration voltages. If it is instead taken as S1−Sload, it gives 0.0830+j0.2976 pu; the two differ because after two iterations the calculated bus 2 power has not yet reached the specified load (the solution is not fully converged). The converged answer is V2=0.8879∠−8.420∘ pu.)
Answer: V2=0.8886∠−8.389∘ pu; slack bus supplies P1=158.30 MW and Q1=79.76 MVAr; losses ≈8.80 MW and 30.16 MVAr.