Skip to main content

Formwork for excavation, timbering, RCC formwork

Short answer

Formwork for excavation is timbering to support trench sides, using stay bracing (spaced boards and struts) in firm soil and vertical sheeting, box sheeting, runners or sheet piling in loose soil. Formwork for RCC is a temporary mould that must be strong, rigid, leak-proof, smooth, oiled, economical, easily stripped, and removed at proper times.

Describe briefly on formwork for excavation and different methods used in timbering of trenches for firm and loose soil. Define formwork for reinforced concrete construction and its principal requirements. Illustrate sketches wherever necessary.

Formwork for excavation (timbering)

It is the temporary support of the sides of a trench or pit, to prevent the earth from falling in and to protect the workers. It is used when the depth exceeds about 1.5 m.

For firm soil:

  • Stay bracing: vertical poling boards in pairs at 2-3 m intervals, held apart by cross struts, for depths up to about 2 m.

For loose soil:

  • Box sheeting: closely placed vertical (or horizontal) boards held by walings and struts, forming a box, for depths up to about 4 m.
  • Vertical sheeting: for deep trenches (up to about 10 m) in soft soil; done in stages of 2-3 m with an offset at each stage, each stage having its own sheeting, walings and struts.
  • Runners: long boards driven ahead of the excavation in very soft, running soil.
  • Sheet piling: timber or steel sheets driven to depth for wide or deep excavations in soft, wet soil.
   |poling|   strut   |poling|
   |board |==========|board |
   |      | waling   |      |

Formwork for RCC construction

Formwork is a temporary mould of timber, plywood or steel into which concrete is cast, and which is removed after the concrete has hardened.

Principal requirements:

  • Strong and stable to carry the loads of wet concrete, workers and equipment without sagging.
  • Rigid, and correct in shape, line and level.
  • Tight joints, with no leakage of cement grout.
  • Smooth surfaces, oiled for easy stripping.
  • Quick and easy to erect and strip without damaging the concrete.
  • Economical and re-usable.
  • Supported on a firm base with sole plates and wedges.
  • Struck at the proper time as per IS 456.

✓ Answer checked by Claude Opus 5.5 (high effort)