- 2070 Magh · 4 marks
ERR to select best proposal A or B
Short answer
ERR at ε=25%: A=30.96%, B=30.82%. Both >20% MARR. Incremental B-A ERR=28.69% > 20%. Select Proposal B.
Select the best proposal using ERR (ε = 25%, MARR = 20%).
| EOY | 0 | 1 | 2 | 3 | 4 | 5 | 6 |
|---|---|---|---|---|---|---|---|
| Proposal A | -6400 | 2620 | 2900 | 3020 | 3100 | 3100 | 2600 |
| Proposal B | -7550 | 2050 | 4060 | 4000 | 3900 | 3500 | 3400 |
ERR is found by compounding receipts to the end of year 6 at ε = 25% and discounting expenditures to year 0 at ε, then solving for i'. Select by the incremental ERR compared with MARR = 20%.
Proposal A:
- Receipts compounded to year 6 at ε: FW(R) = 2,620(3.0518) + 2,900(2.4414) + 3,020(1.9531) + 3,100(1.5625) + 3,100(1.2500) + 2,600(1.0000) = 32,293
- Expenditures discounted to year 0 at ε: PW(E) = 6,400(1.0000) = 6,400
- ERR: 6,400(1 + i')^6 = 32,293 → (1 + i') = (5.0458)^(1/6) → ERR = 30.96%
Proposal B:
- Receipts compounded to year 6 at ε: FW(R) = 2,050(3.0518) + 4,060(2.4414) + 4,000(1.9531) + 3,900(1.5625) + 3,500(1.2500) + 3,400(1.0000) = 37,849
- Expenditures discounted to year 0 at ε: PW(E) = 7,550(1.0000) = 7,550
- ERR: 7,550(1 + i')^6 = 37,849 → (1 + i') = (5.0132)^(1/6) → ERR = 30.82%
Both ERRs (30.96% and 30.82%) exceed MARR = 20%, so both are acceptable. B needs more investment, so test the increment.
Incremental (B - A)
Cash flows: [-1150, -570, 1160, 980, 800, 400, 800] ERR(B - A) = 28.69% > MARR 20%
Answer: Select Proposal B, because its extra investment of Rs. 1,150 earns 28.7% which exceeds MARR = 20%.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- ERR method to select best of three projects · Engineering Economics, chapter 4
- ERR to select between projects A and B · Engineering Economics, chapter 4
- ERR with MARR 12% and reinvestment 14% · Engineering Economics, chapter 3
- IRR to select best of A, B, C (15 years) · Engineering Economics, chapter 4
- Incremental IRR to select best of A to D · Engineering Economics, chapter 4
- ERR with MARR = ε = 10% · Engineering Economics, chapter 3
- Vertical curve -2% and +3%, IP 2600, 0.5% per 20 m · Surveying II, chapter 6
- Chebyshev order (0.5 dB, 20 dB, 3500 rad/s) · Filter Design, chapter 2
- Surge numerical: 4 m tunnel, 4000 m, 20 m³/s · Hydropower Engineering, chapter 6 · asked 2×