- 2065 Chaitra (old course) · 10 marks
Vertical curve -2% and +3%, IP 2600, 0.5% per 20 m
Short answer
Length 200 m. BVC chainage 2500 m, RL 1202.00 m; EVC chainage 2700 m, RL 1203.00 m. Lowest point at chainage 2580 m, RL 1201.20 m, found by x = -g1 L/(g2-g1) = 80 m. RL computed from tangent-offset formula RL = RL_BVC + g1 x/100 + (g2-g1)x²/(200L).
A 2% down gradient meets a 3% up gradient at a chainage of 2600 m, the RL of the point of intersection being 1200.00 m. A vertical parabolic curve is to be set out to connect two grades with pegs at 20 m interval. The rate of change of grade is 0.5% per 20 m chain. Tabulate the chainages and RLs of the station pegs including lowest point on the curve.
A parabolic vertical curve with a constant rate of change of grade is set out using the tangent-offset method.
Step 1: Length of the curve
Rate of change of grade per 20 m, algebraic change in grade .
Step 2: BVC, EVC and their levels
The curve is a sag (valley) curve with equal tangent lengths m.
Step 3: RL of curve points
Using the tangent-offset form of the parabola ( measured from BVC, grades in %):
with , , m, so the offset is and pegs are taken at multiples of 20 m.
| Chainage (m) | x from BVC (m) | Tangent RL (m) | Offset y (m) | Curve RL (m) |
|---|---|---|---|---|
| 2500 | 0 | 1202.000 | 0.000 | 1202.000 |
| 2520 | 20 | 1201.600 | +0.050 | 1201.650 |
| 2540 | 40 | 1201.200 | +0.200 | 1201.400 |
| 2560 | 60 | 1200.800 | +0.450 | 1201.250 |
| 2580 | 80 | 1200.400 | +0.800 | 1201.200 |
| 2600 | 100 | 1200.000 | +1.250 | 1201.250 |
| 2620 | 120 | 1199.600 | +1.800 | 1201.400 |
| 2640 | 140 | 1199.200 | +2.450 | 1201.650 |
| 2660 | 160 | 1198.800 | +3.200 | 1202.000 |
| 2680 | 180 | 1198.400 | +4.050 | 1202.450 |
| 2700 | 200 | 1198.000 | +5.000 | 1203.000 |
Check: the last curve RL (1203 m) equals the RL of EVC (1203 m), and the curve at the IP chainage lies 1.25 m above the IP, at RL 1201.25 m.
Step 4: Lowest point
At the lowest point the grade is zero, so m from BVC.
- Chainage = 2500 + 80 = 2580 m
- RL = 1202 + (-2/100)(80) + (5)(80)²/(200 × 200) = 1201.2 m
Answer: m, BVC at 2500 m (RL 1202 m), EVC at 2700 m (RL 1203 m); curve levels as tabulated.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Vertical curve +0.5% and -0.7%, IP RL 350.750 · Surveying II, chapter 6
- Vertical curve 180 m, -3.5% then +4.5%, IP 2450 · Surveying II, chapter 6 · asked 2×
- Vertical curve 180 m, -4.5% then +3.5%, IP 450 · Surveying II, chapter 6 · asked 2×
- Vertical curve -0.5% and +0.7%, IP RL 500 · Surveying II, chapter 6
- Vertical curve -0.7% and +0.5%, IP RL 650 · Surveying II, chapter 6
- Derive RL on parabolic vertical curve · Surveying II, chapter 6
- Vertical curve chainage and elevations, R 8000 m · Transportation Engineering I, chapter 3
- Vertical curve, -3% and 1.5% at chainage 2000 · Transportation Engineering I, chapter 3
- Vertical curve +4% and -3%, through given point · Transportation Engineering I, chapter 3
- Vertical curve with intermediate sight distance · Transportation Engineering I, chapter 3