- Asked 2/26
- 2065 Kartik (old course) · 8 marks
Vertical curve 180 m, -4.5% then +3.5%, IP 450
Short answer
Length 180 m; BVC chainage 360 m, RL 904.05 m; EVC chainage 540 m, RL 903.15 m. Lowest point at chainage 461.25 m, RL 901.772 m, computed by tangent-offset method using RL = RL_BVC + g1 x/100 + (g2-g1)x²/(200L).
A down grade of 4.5% is followed by an upgrade of 3.5%. The reduced level and chainage of the point of intersection are 900.00 m and 450.00 m respectively. A vertical parabolic curve 180 m long is to be introduced to connect the two grades. The pegs are to be fixed at 20 m intervals. Calculate including lowest point also.
A parabolic vertical curve of the given length is set out by the tangent-offset method.
Step 1: Given data
, , m, change of grade . Mid-ordinate m.
Step 2: BVC, EVC and their levels
The curve is a sag (valley) curve with equal tangent lengths m.
Step 3: RL of curve points
Using the tangent-offset form of the parabola ( measured from BVC, grades in %):
with , , m, so the offset is and pegs are taken at multiples of 20 m.
| Chainage (m) | x from BVC (m) | Tangent RL (m) | Offset y (m) | Curve RL (m) |
|---|---|---|---|---|
| 360 | 0 | 904.050 | 0.000 | 904.050 |
| 380 | 20 | 903.150 | +0.089 | 903.239 |
| 400 | 40 | 902.250 | +0.356 | 902.606 |
| 420 | 60 | 901.350 | +0.800 | 902.150 |
| 440 | 80 | 900.450 | +1.422 | 901.872 |
| 460 | 100 | 899.550 | +2.222 | 901.772 |
| 480 | 120 | 898.650 | +3.200 | 901.850 |
| 500 | 140 | 897.750 | +4.356 | 902.106 |
| 520 | 160 | 896.850 | +5.689 | 902.539 |
| 540 | 180 | 895.950 | +7.200 | 903.150 |
Check: the last curve RL (903.15 m) equals the RL of EVC (903.15 m), and the curve at the IP chainage lies 1.8 m above the IP, at RL 901.8 m.
Step 4: Lowest point
At the lowest point the grade is zero, so m from BVC.
- Chainage = 360 + 101.25 = 461.25 m
- RL = 904.05 + (-4.5/100)(101.25) + (8)(101.25)²/(200 × 180) = 901.772 m
Answer: m, BVC at 360 m (RL 904.05 m), EVC at 540 m (RL 903.15 m); curve levels as tabulated.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Vertical curve 180 m, -3.5% then +4.5%, IP 2450 · Surveying II, chapter 6 · asked 2×
- Vertical curve -2% and +3%, IP 2600, 0.5% per 20 m · Surveying II, chapter 6
- Vertical curve -0.7% and +0.5%, IP RL 650 · Surveying II, chapter 6
- Vertical curve +0.5% and -0.7%, IP RL 350.750 · Surveying II, chapter 6
- Vertical curve -1% and +0.5% by parabolic method · Surveying II, chapter 6 · asked 2×
- Vertical curve -0.5% and +0.7%, IP RL 500 · Surveying II, chapter 6
- Vertical curve -1% and +0.5%, IP 500 m · Surveying II, chapter 6 · asked 2×
- Vertical curve chainage and elevations, R 8000 m · Transportation Engineering I, chapter 3