Skip to main content

Vertical curve +0.5% and -0.7%, IP RL 350.750

Short answer

Length L = 360 m from 1.2% grade change at 0.1% per 30 m. BVC at chainage 320 m, RL 349.850 m; EVC at 680 m, RL 349.490 m. Highest point at chainage 470 m, RL 350.225 m. Curve levels are obtained by adding tangent grade elevation and parabolic offset from BVC.

Calculate the RLs of pegs on a vertical curve connecting two grades of +0.5% and -0.7% at the point of intersection. The chainage and RL of intersection point are 500 m and 350.750 m respectively. The rate of change of grade is 0.1% per 30 m.

A parabolic vertical curve with a constant rate of change of grade is set out using the tangent-offset method.

Step 1: Length of the curve

Rate of change of grade r=0.1%r = 0.1\% per 30 m, algebraic change in grade =−0.7−(0.5)=−1.2%= -0.7 - (0.5) = -1.2\%.

L=∣g2−g1∣r×30=1.20.1×30=360 mL = \frac{|g_2-g_1|}{r}\times 30 = \frac{1.2}{0.1}\times 30 = 360\ \text{m}

Step 2: BVC, EVC and their levels

The curve is a summit (crest) curve with equal tangent lengths L/2=180L/2 = 180 m.

Ch. of BVC=500−180=320 mCh. of EVC=500+180=680 mRL of BVC=350.75−(0.5)100×180=349.85 mRL of EVC=350.75+(−0.7)100×180=349.49 m\begin{aligned} \text{Ch. of BVC} &= 500 - 180 = 320\ \text{m}\\ \text{Ch. of EVC} &= 500 + 180 = 680\ \text{m}\\ \text{RL of BVC} &= 350.75 - \frac{(0.5)}{100}\times 180 = 349.85\ \text{m}\\ \text{RL of EVC} &= 350.75 + \frac{(-0.7)}{100}\times 180 = 349.49\ \text{m} \end{aligned}

Step 3: RL of curve points

Using the tangent-offset form of the parabola (xx measured from BVC, grades in %):

yx=RLBVC+g1x100+(g2−g1)x2200Ly_x = \text{RL}_{BVC} + \frac{g_1 x}{100} + \frac{(g_2-g_1)x^2}{200L}

with g1=0.5%g_1 = 0.5\%, g2=−0.7%g_2 = -0.7\%, L=360L = 360 m, so the offset is y=(−1.2)x2200×360y = \frac{(-1.2)x^2}{200\times 360} and pegs are taken at multiples of 30 m.

Chainage (m)x from BVC (m)Tangent RL (m)Offset y (m)Curve RL (m)
3200349.8500.000349.850
33010349.900-0.002349.898
36040350.050-0.027350.023
39070350.200-0.082350.118
420100350.350-0.167350.183
450130350.500-0.282350.218
480160350.650-0.427350.223
510190350.800-0.602350.198
540220350.950-0.807350.143
570250351.100-1.042350.058
600280351.250-1.307349.943
630310351.400-1.602349.798
660340351.550-1.927349.623
680360351.650-2.160349.490

Check: the last curve RL (349.49 m) equals the RL of EVC (349.49 m), and the curve at the IP chainage lies 0.54 m below the IP, at RL 350.21 m.

Step 4: Highest point

At the highest point the grade is zero, so x=−g1Lg2−g1=−0.5×360−1.2=150x = \dfrac{-g_1 L}{g_2-g_1} = \dfrac{-0.5\times 360}{-1.2} = 150 m from BVC.

  • Chainage = 320 + 150 = 470 m
  • RL = 349.85 + (0.5/100)(150) + (-1.2)(150)²/(200 × 360) = 350.225 m

Peg interval is not stated, so it is taken as 30 m (equal to the length over which the rate of change of grade is specified). The BVC and EVC are included.

Answer: L=360L = 360 m, BVC at 320 m (RL 349.85 m), EVC at 680 m (RL 349.49 m); curve levels as tabulated.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Surveying II chapter 6 questions →