Vertical curve with 300 m grade sections

Short answer

For summit curve N=0.07, effective f=0.315 gives SSD=194.5 m and L=601.7 m, adopt 600 m. PVI=125.266 m, BVC=113.266 m, EVC=116.266 m, highest point=120.124 m, 50 m before PVI=119.621 m, 50 m after PVI=120.121 m.

A 300 m long ascending section of a double lane road with two way traffic road with 4% grade meets with a 300 m long descending section with 3% grade. Design the vertical curve to meet the visibility requirement. Design speed is 100 kmph. The braking efficiency is 90%. Calculate the formation levels of main points on curve at a distance of 50 m from PVI on either sides, at the highest point of the formation lines and at the beginning and end section of road, given the final formation level of the road at a distance of 25 m right from PVI as 120.105.

An ascending 4% grade followed by a descending 3% grade gives a summit curve, N=0.04+0.03=0.07N=0.04+0.03=0.07.

Stopping sight distance

V=100V=100 km/h, t=2.5t=2.5 s, coefficient of friction f=0.35f=0.35 (assumed, IRC value for 100 km/h), so the effective f=0.35×0.90=0.315f=0.35\times0.90=0.315:

SSD=0.278(100)(2.5)+1002254(0.315)=194.5 mSSD=0.278(100)(2.5)+\frac{100^2}{254(0.315)}=194.5\ \text{m}

Length of curve

L=NS24.4=0.07(194.5)24.4=601.7 mL=\frac{NS^2}{4.4}=\frac{0.07(194.5)^2}{4.4}=601.7\ \text{m}

The grade sections are each 300 m long, so the curve can extend at most 300 m on each side of the PVI. Adopt L = 600 m (half = 300 m). The sight distance this gives, S=4.4L/N=194.2S=\sqrt{4.4L/N}=194.2 m, is practically the required SSD (194.5 m), so the requirement is met.

Formation level of the PVI (from the given point)

The point 25 m right of PVI is 300−25=275300-25=275 m from EVC. Offset below the tangent:

yo=N(275)22L=0.07(275)22(600)=4.411 my_o=\frac{N(275)^2}{2L}=\frac{0.07(275)^2}{2(600)}=4.411\ \text{m} 120.105=RLPVI−0.03(25)−4.411⇒RLPVI=125.266 m120.105=RL_{PVI}-0.03(25)-4.411\Rightarrow RL_{PVI}=125.266\ \text{m}

Main levels

RLBVC=125.266−0.04(300)=113.266 m,RLEVC=125.266−0.03(300)=116.266 mRL_{BVC}=125.266-0.04(300)=113.266\ \text{m},\qquad RL_{EVC}=125.266-0.03(300)=116.266\ \text{m}
  • 50 m before PVI (x=250x=250 m from BVC): offset =0.07(250)21200=3.646=\dfrac{0.07(250)^2}{1200}=3.646 m; level =125.266−0.04(50)−3.646=119.621=125.266-0.04(50)-3.646=\mathbf{119.621} m
  • 50 m after PVI: level =125.266−0.03(50)−3.646=120.121=125.266-0.03(50)-3.646=\mathbf{120.121} m
  • Highest point: x=g1LN=0.04(600)0.07=342.86x=\dfrac{g_1L}{N}=\dfrac{0.04(600)}{0.07}=342.86 m from BVC
RLmax=113.266+0.042(600)2(0.07)=120.124 mRL_{max}=113.266+\frac{0.04^2(600)}{2(0.07)}=120.124\ \text{m}

Answer: RL of PVI = 125.27 m; beginning (BVC) = 113.27 m; end (EVC) = 116.27 m; highest point = 120.12 m; 50 m before PVI = 119.62 m; 50 m after PVI = 120.12 m.