- 2075 Baisakh · 8 marks
Vertical curve -0.7% and +0.5%, IP RL 650
Short answer
Length 240 m based on grade change of 1.2% at rate 0.1% per 20 m. BVC at 880 m (RL 650.84 m), EVC at 1120 m (RL 650.60 m). Lowest point at chainage 1020 m, elevation 650.35 m.
A grade of -0.7% is followed by another grade of +0.5%. The two ends of these portions are connected by a parabolic vertical curve. The chainage and RL of intersection point are 1000 and 650 m respectively. Calculate RLs of all the points on the curve. Take peg interval of 20 m and rate of change of grade is 0.1% per 20 m.
A parabolic vertical curve with a constant rate of change of grade is set out using the tangent-offset method.
Step 1: Length of the curve
Rate of change of grade per 20 m, algebraic change in grade .
Step 2: BVC, EVC and their levels
The curve is a sag (valley) curve with equal tangent lengths m.
Step 3: RL of curve points
Using the tangent-offset form of the parabola ( measured from BVC, grades in %):
with , , m, so the offset is and pegs are taken at multiples of 20 m.
| Chainage (m) | x from BVC (m) | Tangent RL (m) | Offset y (m) | Curve RL (m) |
|---|---|---|---|---|
| 880 | 0 | 650.840 | 0.000 | 650.840 |
| 900 | 20 | 650.700 | +0.010 | 650.710 |
| 920 | 40 | 650.560 | +0.040 | 650.600 |
| 940 | 60 | 650.420 | +0.090 | 650.510 |
| 960 | 80 | 650.280 | +0.160 | 650.440 |
| 980 | 100 | 650.140 | +0.250 | 650.390 |
| 1000 | 120 | 650.000 | +0.360 | 650.360 |
| 1020 | 140 | 649.860 | +0.490 | 650.350 |
| 1040 | 160 | 649.720 | +0.640 | 650.360 |
| 1060 | 180 | 649.580 | +0.810 | 650.390 |
| 1080 | 200 | 649.440 | +1.000 | 650.440 |
| 1100 | 220 | 649.300 | +1.210 | 650.510 |
| 1120 | 240 | 649.160 | +1.440 | 650.600 |
Check: the last curve RL (650.6 m) equals the RL of EVC (650.6 m), and the curve at the IP chainage lies 0.36 m above the IP, at RL 650.36 m.
Step 4: Lowest point
At the lowest point the grade is zero, so m from BVC.
- Chainage = 880 + 140 = 1020 m
- RL = 650.84 + (-0.7/100)(140) + (1.2)(140)²/(200 × 240) = 650.35 m
Answer: m, BVC at 880 m (RL 650.84 m), EVC at 1120 m (RL 650.6 m); curve levels as tabulated.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Vertical curve +0.5% and -0.7%, IP RL 350.750 · Surveying II, chapter 6
- Vertical curve -1% and +0.5% by parabolic method · Surveying II, chapter 6 · asked 2×
- Vertical curve -0.5% and +0.7%, IP RL 500 · Surveying II, chapter 6
- Vertical curve 180 m, -3.5% then +4.5%, IP 2450 · Surveying II, chapter 6 · asked 2×
- Vertical curve -1% and +0.5%, IP 500 m · Surveying II, chapter 6 · asked 2×
- Vertical curve -2% and +3%, IP 2600, 0.5% per 20 m · Surveying II, chapter 6
- Vertical curve chainage and elevations, R 8000 m · Transportation Engineering I, chapter 3
- Vertical curve, -3% and 1.5% at chainage 2000 · Transportation Engineering I, chapter 3
- Vertical curve with 300 m grade sections · Transportation Engineering I, chapter 3
- Vertical curve 35 m headlight and momentum grade · Transportation Engineering I, chapter 3