- Asked 2/26
- 2073 Magh · 6 marks
Vertical curve -1% and +0.5% by parabolic method
Short answer
The rate of change of grade 0.1%/20 m and algebraic change 1.5% give length L = (1.5/0.1)×20 = 300 m. BVC at chainage 1350 m (RL 1251.5 m), EVC at 1650 m (RL 1250.75 m). The lowest point is at chainage 1550 m, RL 1250.5 m.
In a road alignment a grade of (-)1% is followed by another grade of 0.5%. The chainage and RL of intersection pt are 1500 m and 1250 m respectively. The rate of change of grade is 0.1% /20 m. Calculate the necessary data required for setting out of vertical curve by parabolic equation method take peg interval = 30 m.
A parabolic vertical curve with a constant rate of change of grade is set out using the tangent-offset method.
Step 1: Length of the curve
Rate of change of grade per 20 m, algebraic change in grade .
Step 2: BVC, EVC and their levels
The curve is a sag (valley) curve with equal tangent lengths m.
Step 3: RL of curve points
Using the tangent-offset form of the parabola ( measured from BVC, grades in %):
with , and m, the offset is . The pegs are taken at multiples of 30 m.
| Chainage (m) | x from BVC (m) | Tangent RL (m) | Offset y (m) | Curve RL (m) |
|---|---|---|---|---|
| 1350 | 0 | 1251.500 | 0.000 | 1251.500 |
| 1380 | 30 | 1251.200 | +0.023 | 1251.223 |
| 1410 | 60 | 1250.900 | +0.090 | 1250.990 |
| 1440 | 90 | 1250.600 | +0.203 | 1250.803 |
| 1470 | 120 | 1250.300 | +0.360 | 1250.660 |
| 1500 | 150 | 1250.000 | +0.563 | 1250.563 |
| 1530 | 180 | 1249.700 | +0.810 | 1250.510 |
| 1560 | 210 | 1249.400 | +1.103 | 1250.503 |
| 1590 | 240 | 1249.100 | +1.440 | 1250.540 |
| 1620 | 270 | 1248.800 | +1.823 | 1250.623 |
| 1650 | 300 | 1248.500 | +2.250 | 1250.750 |
Check: the last curve RL (1250.75 m) equals the RL of EVC (1250.75 m), and at the IP chainage the curve lies 0.563 m above the IP, at RL 1250.563 m.
Step 4: Lowest point
At the lowest point the grade is zero, so m from BVC.
- Chainage = 1350 + 200 = 1550 m
- RL = 1251.5 + (-1/100)(200) + (1.5)(200)²/(200 × 300) = 1250.5 m
Answer: m, BVC at 1350 m (RL 1251.5 m), EVC at 1650 m (RL 1250.75 m), lowest point at chainage 1550 m (RL 1250.5 m); curve levels as tabulated.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Vertical curve -1% and +0.5%, IP 500 m · Surveying II, chapter 6 · asked 2×
- Vertical curve -0.7% and +0.5%, IP RL 650 · Surveying II, chapter 6
- Vertical curve table, -4.5% and +3.5%, 200 m · Surveying II, chapter 6
- Vertical curve -2% and +3%, IP 2600, 0.5% per 20 m · Surveying II, chapter 6
- Derive RL on parabolic vertical curve · Surveying II, chapter 6
- Vertical curve +0.5% and -0.7%, IP RL 350.750 · Surveying II, chapter 6
- Short note: Setting out vertical curve · Surveying II, chapter 6
- Vertical curve chainage and elevations, R 8000 m · Transportation Engineering I, chapter 3
- Vertical curve 35 m headlight and momentum grade · Transportation Engineering I, chapter 3
- Vertical curve, -3% and 1.5% at chainage 2000 · Transportation Engineering I, chapter 3
- Vertical curve with 300 m grade sections · Transportation Engineering I, chapter 3