Derive the balancing depth of a canal

Short answer

Balancing depth is where cut volume equals fill volume. Equating trapezoidal cutting area (B + n1 d)d to filling area of two banks 2h(b + n2 h) yields n1 d^2 + B d - 2h(b + n2 h) = 0. Solving gives d = [-B + sqrt(B^2 + 8 n1 h(b + n2 h))]/(2 n1).

Derive the expression for the balancing depth for a canal section.

Balancing depth is the depth of excavation (depth of the bed below ground level) at which the volume of earth cut from the canal equals the volume of earth needed to form the banks, so that no earth has to be borrowed or spoiled. It gives the most economical section.

Notation

BB = bed width, dd = depth of the bed below ground level (balancing depth), n1n_1 = side slope in cutting (n1n_1H:1V), n2n_2 = side slope of the banks, bb = top width of bank, hh = height of bank above ground level (for a bank-on-both-sides canal).

        b                      b
      |---|                  |---|
      ____                    ____
     /    \                  /    \    h
 ---/      \__    GL       __/      \---
              \            /   d
               \__________/
                    B

Derivation (per metre length of canal)

Cutting area (trapezoid of bottom width BB, depth dd, side slope n1n_1):

Ac=(B+n1d) dA_c = (B + n_1 d)\,d

Filling area of one bank (top width bb, height hh, slope n2n_2 on both faces):

Af=h (b+n2h)A_f = h\,(b + n_2 h)

For two banks, Af=2h (b+n2h)A_f = 2h\,(b + n_2 h).

For balancing, cutting = filling:

(B+n1d) d=2h (b+n2h)(B + n_1 d)\,d = 2h\,(b + n_2 h) n1d2+Bd−2h(b+n2h)=0n_1 d^2 + B d - 2h(b+n_2 h) = 0 d=−B+B2+8n1h (b+n2h)2n1d = \frac{-B + \sqrt{B^2 + 8 n_1 h\,(b + n_2 h)}}{2 n_1}

When the bank height depends on d

For a canal of full supply depth DD and free board FF, the top of the bank is at D+F−dD + F - d above ground level, so h=D+F−dh = D + F - d. Substituting in the equation above gives a quadratic in dd whose smaller positive root is the balancing depth. If a service bank of top width bsb_s is provided on one side, then fill =h(b+n2h)+h(bs+n2h)= h(b + n_2 h) + h(b_s + n_2 h).

If the actual depth is greater than dd, earth is surplus (spoil banks are needed); if it is less, borrow pits are needed.