- Asked 2/34
- 2077 Chaitra · 3 marks
- 2062 Kartik (old course) · 8 marks
Derive the balancing depth of a canal
Short answer
Balancing depth is where cut volume equals fill volume. Equating trapezoidal cutting area (B + n1 d)d to filling area of two banks 2h(b + n2 h) yields n1 d^2 + B d - 2h(b + n2 h) = 0. Solving gives d = [-B + sqrt(B^2 + 8 n1 h(b + n2 h))]/(2 n1).
Derive the expression for the balancing depth for a canal section.
Balancing depth is the depth of excavation (depth of the bed below ground level) at which the volume of earth cut from the canal equals the volume of earth needed to form the banks, so that no earth has to be borrowed or spoiled. It gives the most economical section.
Notation
= bed width, = depth of the bed below ground level (balancing depth), = side slope in cutting (H:1V), = side slope of the banks, = top width of bank, = height of bank above ground level (for a bank-on-both-sides canal).
b b
|---| |---|
____ ____
/ \ / \ h
---/ \__ GL __/ \---
\ / d
\__________/
B
Derivation (per metre length of canal)
Cutting area (trapezoid of bottom width , depth , side slope ):
Filling area of one bank (top width , height , slope on both faces):
For two banks, .
For balancing, cutting = filling:
When the bank height depends on d
For a canal of full supply depth and free board , the top of the bank is at above ground level, so . Substituting in the equation above gives a quadratic in whose smaller positive root is the balancing depth. If a service bank of top width is provided on one side, then fill .
If the actual depth is greater than , earth is surplus (spoil banks are needed); if it is less, borrow pits are needed.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Balancing depth and canal cross-section · Irrigation and Drainage Engineering, chapter 3
- Canal standards and balancing depth · Irrigation and Drainage Engineering, chapter 3
- Balancing depth with service bank and free board · Irrigation and Drainage Engineering, chapter 3
- Balancing depth: bed width 20 m · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Balancing depth: bed width 25 m · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Derive expression for tile drain spacing · Irrigation and Drainage Engineering, chapter 9 · asked 8×
- Derive development length expression · Design of RCC Structure, chapter 6 · asked 6×
- Derive most economical rectangular section · Hydraulics, chapter 6
- Draw balanced canal section · Estimating and Costing, chapter 6
- Derive PET expression by Penman's method · Engineering Hydrology, chapter 3
All Irrigation and Drainage Engineering chapter 3 questions →