- 2074 Bhadra · 4 marks
Balancing depth with service bank and free board
Short answer
Equate cutting area (8+d)*d to filling area h*(6.8+3h) with h=2.1-d. Solve quadratic 2d² - 27.4d + 27.51 = 0. Balancing depth = 1.09 m; bank height above ground = 1.01 m.
A canal has bed width of 8 m. Full supply depth of water is 1.5 m, side slope in cutting 1:1 and filling 1.5:1. Top width of the bank is 1.8 m and service bank is 5.0 m. Free board is kept 0.6 m. Calculate balancing depth so as to get the most economical section.
Given: m, full supply depth m, cutting slope (1:1), banking slope (1.5:1), top width of ordinary bank m, top width of service bank m, free board m.
Set-up. Let = depth of the bed below ground level (balancing depth). The water surface is above ground, and the top of the bank is at above ground:
Cutting area:
Filling area (one ordinary bank and one service bank, slope 1.5:1 on both faces):
Equate with :
(The larger root, m, is rejected because it gives a negative bank height.)
Check: m; m and m.
Answer: balancing depth (bed below ground level) = 1.09 m; bank height above ground = 1.01 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Balancing depth: bed width 20 m · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Balancing depth: bed width 25 m · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Balancing depth and canal cross-section · Irrigation and Drainage Engineering, chapter 3
- Canal cross-section in cutting and filling · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Stable depth and bed width: Q 5, d50 3 cm · Irrigation and Drainage Engineering, chapter 4
- Derive the balancing depth of a canal · Irrigation and Drainage Engineering, chapter 3 · asked 2×
- Canal earthwork, bed 3 m, free board 0.44 m · Estimating and Costing, chapter 6
- Economical rectangular condition and trapezoidal bed slope · Hydro Power, chapter 1
- Channel earthwork and land area, bed 4 m · Estimating and Costing, chapter 6 · asked 2×
- Irrigation channel earthwork, bed 5 m, 1 in 3000 · Estimating and Costing, chapter 6
All Irrigation and Drainage Engineering chapter 3 questions →