Balancing depth and canal cross-section
Short answer
Equate cutting area (8+1.5d)*d to filling area 2*3*(2+2*3)=48 m². Solve quadratic 1.5d² + 8d - 48 = 0. Balancing depth = 3.59 m.
An irrigation channel has a bottom width 8 m and side slopes of 1.5H:1V in cutting and 2H:1V in filling. The width of the crest of bank is 2 m and its height above the ground level is 3 m. Compute the balancing depth and draw a neat x-section of the canal illustrating the various dimensions and level it.
Given: m, (cutting), (filling), crest width m, bank height above ground m. Banks are on both sides with 2:1 slopes on both faces; no berm.
Filling area:
Cutting area:
Equate:
Answer: balancing depth = 3.59 m.
Cross-section (level with the ground at 0.00):
2.0 m 2.0 m
|---| |---|
+3.00 ____ ____ +3.00
/ \ / \
2:1 / \ ground 0.00 / \ 2:1
---/ \-- --/ \---
\ 1.5:1 1.5:1/
\ / depth 3.59 m
\__________/ -3.59
8.0 m bed
Bed level is 3.59 m below ground; crest of each bank is 3.0 m above ground; bed width 8 m; cutting slopes 1.5H:1V; bank slopes 2H:1V; crest width 2 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Canal cross-section in cutting and filling · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Balancing depth with service bank and free board · Irrigation and Drainage Engineering, chapter 3
- Balancing depth: bed width 20 m · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Balancing depth: bed width 25 m · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Vertical drop crest level and width, Q 30 · Irrigation and Drainage Engineering, chapter 7
- Derive the balancing depth of a canal · Irrigation and Drainage Engineering, chapter 3 · asked 2×
- Efficient trapezoid with unequal side slopes · Hydraulics, chapter 6
- Irrigation channel earthwork, bed 5 m, 1 in 3000 · Estimating and Costing, chapter 6
- Efficient rectangular section and triangular channel depth · Hydro Power, chapter 1 · asked 2×
- Efficient trapezoidal section and triangular channel depth · Hydro Power, chapter 1 · asked 2×
All Irrigation and Drainage Engineering chapter 3 questions →