Drainage rate (mm/day), initial 55 mm
Determine drainage rate in mm/day required to meet the following conditions for healthy growth of rice in bunded field of plain area in Nepal. Initial water level in field = 55 mm; Maximum water level is 400 mm which may persist for up to 1 day; Depth of excess of 250 mm may persist for up to 2 days; No rainfall follows the design rainfall for several days; Design 3 days rainfall is 400 mm; Neglect ET and deep percolation losses.
Rice tolerates standing water only within limits of depth and duration, so the drainage rate is chosen such that the field water level during and after the design storm stays within these limits. The field is a bunded rice field in the plains (Terai).
Given data and assumptions
- Initial depth = 55 mm; design 3-day rainfall = 400 mm, falling uniformly, so the rain rate = 133.3 mm/day
- Maximum depth 400 mm may persist for 1 day; depth above 250 mm may persist for 2 days
- ET and deep percolation neglected (safe side); drainage (mm/day) starts with the rain and is constant
Water level history
During the storm the level rises at per day, and after it the level falls at per day:
The duration condition above 250 mm governs. Trial values:
| D (mm/day) | Peak level (mm) | Time above limit (days) |
|---|---|---|
| 40 | 335 | 3.04 |
| 45 | 320 | 2.35 |
| 47.9 | 311 | 2.00 |
| 50 | 305 | 1.76 |
| 55 | 290 | 1.24 |
Solving = 2 days gives = 47.9 mm/day. Then:
- = 55 + 400 − 3 × 47.9 = 311 mm, which is below 400 mm, so the 400 mm level is never reached and the 1-day limit is satisfied
- = 2.28 days, = 1.28 days, = (3 − 2.28) + 1.28 = 2.00 days
Conversion: 1 mm/day = 10 m³/ha/day = 0.1157 l/s/ha, so
Answer: drainage rate ≈ 47.9 mm/day (≈ 5.5 l/s/ha); adopt 48 mm/day.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Drainage rate (l/s/ha) for bunded rice fields · Irrigation and Drainage Engineering, chapter 9 · asked 3×
- Drainage rate: 300 mm in 3 days, growth factor 1.5 · Irrigation and Drainage Engineering, chapter 9 · asked 2×
- Drainage canal for 5 ha paddy field · Irrigation and Drainage Engineering, chapter 9 · asked 2×
- Surface drainage design, 40 ha Terai field · Irrigation and Drainage Engineering, chapter 9
- Design discharge for surface drainage, bunded field · Irrigation and Drainage Engineering, chapter 9
All Irrigation and Drainage Engineering chapter 9 questions →