Design dischargeQ = D × A, where drainage rateD is found by trial so that peak water depthh_peak = h0 + R –3D and duration above permissible depths stay within crop limits. Convert1 mm/day =0.1157 l/s/ha.

How to fix the design discharge for the surface drainage system in the bunded field?

In bunded rice fields the design discharge of the surface drain is fixed from the drainage rate that satisfies the tolerance of the crop to depth and duration of flooding.

  1. Design rainfall: find the maximum 3-day rainfall RR for the chosen return period (5–10 years), using the frequency analysis or the mean annual value × growth factor.
  2. Initial depth: take the standing water h0h_0 in the bunded field (40–50 mm).
  3. Crop tolerance: fix the maximum depth hmaxh_{max} and its permissible duration, and the depth heh_e and the duration TeT_e for which it may persist (for example 300–400 mm for 1 day, 200–250 mm for 2–3 days).
  4. Water-level history: assuming the rain falls uniformly in 3 days, ET and percolation neglected, and drainage DD constant: hpeak=h0+R−3D,Te=(3−he−h0R/3−D)+hpeak−heDh_{peak}=h_0+R-3D, \qquad T_e=\left(3-\frac{h_e-h_0}{R/3-D}\right)+\frac{h_{peak}-h_e}{D} Find DD (mm/day) by trial so that the limits are just satisfied; convert: 1 mm/day = 0.1157 l/s/ha.
  5. Design discharge: Q=D AQ = D\,A with DD in l/s/ha and AA in ha (gives l/s). For large areas, a reduction factor for the travel time is sometimes applied.