- Asked 2/34
- 2074 Bhadra · 6 marks
Drainage rate: 300 mm in 3 days, growth factor 1.5
Short answer
WithR=450 mm,h0=40 mm, limits max300 mm1 day,>200 mm3 days. Trial givesD=60.6 mm/day (≈7.0 l/s/ha). Peak308 mm, time above200 mm=3.00 days, time above300 mm=0.23 day.
Determine the drainage rate required to meet the following condition. Maximum yearly precipitation for three consecutive days = 300 mm. The design rainfall is to be taken as 10 year return periods. Initial water level in field = 40 mm. Maximum water level is 300 mm, which may persist for up to one day and depth in excess of 200 mm may persist for up to 3 days. Take growth factor for 10 year return period as 1.5. Assume other suitable data if necessary.
Rice tolerates standing water only up to limits of depth and duration, so the drainage rate is chosen such that the field water level, after the design storm, stays within these limits. The 3-day rainfall of the 10-year return period is the mean annual maximum multiplied by the growth factor: mm.
Given data and assumptions
- Initial depth = 40 mm; design 3-day rainfall = 450 mm, falling uniformly, so the rain rate = 150.0 mm/day
- Maximum depth 300 mm may persist for 1 day; depth above 200 mm may persist for 3 days
- ET and deep percolation neglected (safe side); drainage (mm/day) starts with the rain and is constant
Water level history
During the storm the level rises at per day, and after it the level falls at per day:
The duration condition above 200 mm governs. Trial values:
| D (mm/day) | Peak level (mm) | Time above limit (days) |
|---|---|---|
| 50 | 340 | 4.20 |
| 55 | 325 | 3.59 |
| 60.6 | 308 | 3.00 |
| 65 | 295 | 2.58 |
| 70 | 280 | 2.14 |
Solving = 3 days gives = 60.6 mm/day. Then:
- = 40 + 450 − 3 × 60.6 = 308 mm (slightly above 300 mm; the time above 300 mm is 0.23 day, less than 1 day, so this limit is satisfied)
- = 1.79 days, = 1.79 days, = (3 − 1.79) + 1.79 = 3.00 days
Conversion: 1 mm/day = 10 m³/ha/day = 0.1157 l/s/ha, so
Answer: drainage rate ≈ 60.6 mm/day ≈ 7.0 l/s/ha (adopt 7.0 l/s/ha).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Drainage canal for 5 ha paddy field · Irrigation and Drainage Engineering, chapter 9 · asked 2×
- Drainage rate (mm/day), initial 55 mm · Irrigation and Drainage Engineering, chapter 9 · asked 3×
- Drainage rate (l/s/ha) for bunded rice fields · Irrigation and Drainage Engineering, chapter 9 · asked 3×
- Surface drainage design, 40 ha Terai field · Irrigation and Drainage Engineering, chapter 9
- Days inundated above 200 mm at 3 l/s/ha · Irrigation and Drainage Engineering, chapter 9
- Tile drain spacing: rainfall 1000 mm · Irrigation and Drainage Engineering, chapter 9 · asked 2×
- Tile drain spacing: rainfall 1400 mm · Irrigation and Drainage Engineering, chapter 9 · asked 2×
- 24-hr maximum rainfall for 50-year return period · Engineering Hydrology, chapter 6
- 5th year peak load, incremental growth rate · Transmission and Distribution System Design, chapter 6 · asked 7×
- 5th year peak load (commercial 30 days) · Transmission and Distribution System Design, chapter 6 · asked 7×
- 5th year peak load with population growth · Transmission and Distribution System Design, chapter 6 · asked 7×
All Irrigation and Drainage Engineering chapter 9 questions →