Skip to main content

Drainage rate: 300 mm in 3 days, growth factor 1.5

Short answer

WithR=450 mm,h0=40 mm, limits max300 mm1 day,>200 mm3 days. Trial givesD=60.6 mm/day (≈7.0 l/s/ha). Peak308 mm, time above200 mm=3.00 days, time above300 mm=0.23 day.

Determine the drainage rate required to meet the following condition. Maximum yearly precipitation for three consecutive days = 300 mm. The design rainfall is to be taken as 10 year return periods. Initial water level in field = 40 mm. Maximum water level is 300 mm, which may persist for up to one day and depth in excess of 200 mm may persist for up to 3 days. Take growth factor for 10 year return period as 1.5. Assume other suitable data if necessary.

Rice tolerates standing water only up to limits of depth and duration, so the drainage rate is chosen such that the field water level, after the design storm, stays within these limits. The 3-day rainfall of the 10-year return period is the mean annual maximum multiplied by the growth factor: R=1.5×300=450R = 1.5\times300 = 450 mm.

Given data and assumptions

  • Initial depth h0h_0 = 40 mm; design 3-day rainfall RR = 450 mm, falling uniformly, so the rain rate r=R/3r = R/3 = 150.0 mm/day
  • Maximum depth 300 mm may persist for 1 day; depth above 200 mm may persist for 3 days
  • ET and deep percolation neglected (safe side); drainage DD (mm/day) starts with the rain and is constant

Water level history

During the storm the level rises at (r−D)(r-D) per day, and after it the level falls at DD per day:

hpeak=h0+R−3Dt1=he−h0r−D(time to reach he)t2=hpeak−heD(time to fall back to he)Te=(3−t1)+t2≤3\begin{aligned} h_{peak} &= h_0 + R - 3D \\ t_1 &= \frac{h_e-h_0}{r-D} \quad (\text{time to reach } h_e) \\ t_2 &= \frac{h_{peak}-h_e}{D} \quad (\text{time to fall back to } h_e) \\ T_e &= (3-t_1)+t_2 \le 3 \end{aligned}

The duration condition above 200 mm governs. Trial values:

D (mm/day)Peak level (mm)Time above limit (days)
503404.20
553253.59
60.63083.00
652952.58
702802.14

Solving TeT_e = 3 days gives DD = 60.6 mm/day. Then:

  • hpeakh_{peak} = 40 + 450 − 3 × 60.6 = 308 mm (slightly above 300 mm; the time above 300 mm is 0.23 day, less than 1 day, so this limit is satisfied)
  • t1t_1 = 1.79 days, t2t_2 = 1.79 days, TeT_e = (3 − 1.79) + 1.79 = 3.00 days

Conversion: 1 mm/day = 10 m³/ha/day = 0.1157 l/s/ha, so

D=60.6×1086.4=7.01 l/s/haD = 60.6\times\frac{10}{86.4} = 7.01\ \text{l/s/ha}

Answer: drainage rate ≈ 60.6 mm/day ≈ 7.0 l/s/ha (adopt 7.0 l/s/ha).

✓ Answer checked by Claude Opus 5.5 (high effort)

All Irrigation and Drainage Engineering chapter 9 questions →