- 2071 Bhadra · 8 marks
Critical oxygen deficit and location (table 2)
Short answer
Mixing yields initial deficit 3.28 mg/L, ultimate BOD 92.34 mg/L; constants corrected to 24.58°C (k'=0.2468/day, r'=0.3764/day). Critical deficit 28.09 mg/L at 67.21 km (3.11 days). Deficit far exceeds saturation DO (8.44 mg/L), so the stream turns anaerobic and treatment is required.
A wastewater treatment plant disposes off its effluents into a stream at a point A. Characteristics of the stream at a location upstream of point A and of the effluent are as follows:
| Item | Effluent | Stream |
|---|---|---|
| Flow Rate, m³/sec | 0.35 | 0.60 |
| Dissolved Oxygen, mg/l | 2 | 7 |
| Temperature, °C | 29 | 22 |
| BOD5 at 20°C, mg/l | 155 | 2 |
Assume that the deoxygenation constant at 20°C (base e) = 0.2 per day and the reaeration constant at 20°C (base e) = 0.35 per day. For the mixture, equilibrium concentration of dissolved oxygen for the freshwater is as follows:
| Temperature, °C | 21 | 22 | 23 | 24 | 26 | 28 |
|---|---|---|---|---|---|---|
| DO, mg/l | 8.99 | 8.83 | 8.68 | 8.53 | 8.22 | 7.92 |
The velocity of stream downstream of the point A is 0.25 m/sec. Determine the critical oxygen deficit and its location.
The BOD is the 5-day BOD at 20°C. Rates are base , corrected to the mixture temperature by and . The saturation DO is read from the table at the mixture temperature.
Step 1: Mixture properties
Step 2: Ultimate BOD and corrected constants
Step 3: Critical time, deficit and location
Answer: critical oxygen deficit mg/l at about km downstream of point A ( days). The computed deficit is far larger than the saturation DO (8.44 mg/l), so the formula would give a minimum DO of mg/l, which is physically impossible: the DO actually falls to zero well before the critical point, the stream turns anaerobic, and the effluent must be treated before discharge.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Critical oxygen deficit and location (table) · Sanitary Engineering, chapter 6
- Critical DO deficit, location, sag curve · Sanitary Engineering, chapter 6
- Critical DO location, industry 2.0 m³/s · Sanitary Engineering, chapter 6
- Degree of treatment, industrial wastewater · Sanitary Engineering, chapter 6
- DO deficit 60 km downstream, 2 m³/s stream · Sanitary Engineering, chapter 6 · asked 2×