- 2075 Bhadra · 8 marks
Critical DO location, industry 2.0 m³/s
Short answer
After mixing, initial deficit 2.61 mg/L, ultimate BOD 50.52 mg/L; f=3.00, K=0.1/d (base 10). Critical time 2.149 days, velocity 48 km/d. Critical deficit 10.27 mg/L occurs at 103.2 km downstream. Deficit exceeds saturation DO (9.17 mg/L), so DO reaches zero.
An industry is going to be established in a rural municipality near the river side. The river water and industrial effluent characteristics are as follows:
| Description | Industrial Effluent | River Water |
|---|---|---|
| Flow (m³/sec) | 2.0 | 20.0 |
| Dissolved Oxygen (mg/l) | 0.8 | 7.14 |
| BOD5 at 20°C (mg/l) | 350 | 3.0 |
De-oxygenation rate constant at 20°C (per day, base 10) = 0.1; Re-oxygenation rate constant at 20°C (per day, base 10) = 0.3; Saturation DO at 20°C (mg/l) = 9.17. At what location in the river, the critical DO deficit would occur if the flow velocity in the river is 2 km/hr?
Rates are base 10: /day, /day. The velocity is 2 km/h km/day.
Step 1: Conditions just after mixing
Step 2: Ultimate BOD and self-purification constant
Step 3: Critical time and critical deficit
Location of the critical deficit
Answer: the critical DO deficit ( mg/l) occurs about km downstream of the industry, after days. The computed deficit is larger than the saturation DO (9.17 mg/l), so in reality the DO would drop to zero near this point and the effluent needs treatment.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Critical DO location, industry 1.8 m³/s · Sanitary Engineering, chapter 6
- Critical oxygen deficit and location (table 2) · Sanitary Engineering, chapter 6
- Critical oxygen deficit and location (table) · Sanitary Engineering, chapter 6
- Is treatment necessary? Industry near river · Sanitary Engineering, chapter 6
- Degree of treatment, industrial wastewater · Sanitary Engineering, chapter 6
- Critical DO deficit, location, sag curve · Sanitary Engineering, chapter 6
- Dissolved oxygen by titrimetric method · Water Supply Engineering, chapter 4
- Demand of rural municipality 2018, 15,000 pop · Water Supply Engineering, chapter 3
- Demand of rural municipality, base period 3 years · Water Supply Engineering, chapter 3
- Critical DO deficit and location downstream · Environment and Pollution Control, chapter 4