Septic tank and dispersion trenches, 20 users

Short answer

Septic tank internal dimensions 2.8 m × 1.0 m × 1.8 m (including 0.3 m freeboard) with two chambers. Total liquid volume 4.15 m³. Dispersion trenches: 2 trenches each 27 m long × 0.6 m wide, providing 32.4 m² bottom infiltration area at 50 L/m²/d rate.

Design the septic tank and dispersion trenches in Nepalese perspectives for 20 users.

Assumptions (Nepal practice): water supply 100 L/c/d, sewage 80% of this = 80 L/c/d; detention 24 h; desludging every 3 years; infiltration rate 50 L/m²/d (sandy loam).

Septic tank

  • Sewage flow: Q=20×100×0.8 L/c/d=1600 L/d=1.600 m3/dQ = 20 \times 100\times0.8\ \text{L/c/d} = 1600\ \text{L/d} = 1.600\ \text{m}^3\text{/d}
  • Sewage (settling) zone for 24 h detention: V1=1.600 m3V_1 = 1.600\ \text{m}^3
  • Sludge digestion zone: 0.0425×20=0.850 m30.0425 \times 20 = 0.850\ \text{m}^3
  • Digested sludge storage for 3 years: (0.085/3)×3×20=1.700 m3(0.085/3) \times 3 \times 20 = 1.700\ \text{m}^3
V=1.600+0.850+1.700=4.15 m3V = 1.600 + 0.850 + 1.700 = 4.15\ \text{m}^3

Adopt liquid depth d=1.5d = 1.5 m and L:B≈3:1L:B \approx 3:1.

Plan area=4.15/1.5=2.77 m2B=2.77/3≈1.0 m,L=2.77/1.0≈2.8 m\begin{aligned} \text{Plan area} &= 4.15/1.5 = 2.77\ \text{m}^2 \\ B &= \sqrt{2.77/3} \approx 1.0\ \text{m}, \quad L = 2.77/1.0 \approx 2.8\ \text{m} \end{aligned}

Check: 2.8×1.0×1.5=4.20 m3≥4.15 m32.8 \times 1.0 \times 1.5 = 4.20\ \text{m}^3 \ge 4.15\ \text{m}^3 (safe).

Septic tank: internal size 2.8 m×1.0 m×1.8 m2.8\ \text{m} \times 1.0\ \text{m} \times 1.8\ \text{m} (including 0.3 m free board), in two chambers: first chamber 1.901.90 m long (2/3), second 0.900.90 m (1/3), separated by a partition wall with an opening near mid-depth. Inlet and outlet through T-pipes dipping 0.3 m below water level.

Dispersion trenches

  • Infiltration area: A=1600/50=32.00 m2A = 1600/50 = 32.00\ \text{m}^2 (trench bottom area)
  • Trench width w=0.6w = 0.6 m, so total length =32.00/0.6=53.3= 32.00/0.6 = 53.3 m
  • The maximum length per trench is about 30 m, so adopt 2 trenches, each 27.0 m long (32.4 m² provided), 0.6 m wide and 0.6-1.0 m deep, laid at a grade of 1 in 200 to 1 in 300, at 2 m centre-to-centre spacing.

Each trench has a 0.3 m deep layer of gravel (20-40 mm) with a 100 mm perforated (or open-jointed) distribution pipe laid in it, covered with 50 mm of coarse sand/gravel, a filter layer such as geotextile or straw, and then soil. Effluent is fed from a distribution box.