- 2072 Magh · 8 marks
Septic tank and dispersion trenches, 20 users
Short answer
Septic tank internal dimensions 2.8 m × 1.0 m × 1.8 m (including 0.3 m freeboard) with two chambers. Total liquid volume 4.15 m³. Dispersion trenches: 2 trenches each 27 m long × 0.6 m wide, providing 32.4 m² bottom infiltration area at 50 L/m²/d rate.
Design the septic tank and dispersion trenches in Nepalese perspectives for 20 users.
Assumptions (Nepal practice): water supply 100 L/c/d, sewage 80% of this = 80 L/c/d; detention 24 h; desludging every 3 years; infiltration rate 50 L/m²/d (sandy loam).
Septic tank
- Sewage flow:
- Sewage (settling) zone for 24 h detention:
- Sludge digestion zone:
- Digested sludge storage for 3 years:
Adopt liquid depth m and .
Check: (safe).
Septic tank: internal size (including 0.3 m free board), in two chambers: first chamber m long (2/3), second m (1/3), separated by a partition wall with an opening near mid-depth. Inlet and outlet through T-pipes dipping 0.3 m below water level.
Dispersion trenches
- Infiltration area: (trench bottom area)
- Trench width m, so total length m
- The maximum length per trench is about 30 m, so adopt 2 trenches, each 27.0 m long (32.4 m² provided), 0.6 m wide and 0.6-1.0 m deep, laid at a grade of 1 in 200 to 1 in 300, at 2 m centre-to-centre spacing.
Each trench has a 0.3 m deep layer of gravel (20-40 mm) with a 100 mm perforated (or open-jointed) distribution pipe laid in it, covered with 50 mm of coarse sand/gravel, a filter layer such as geotextile or straw, and then soil. Effluent is fed from a distribution box.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Septic tank and dispersion trench, 12 persons · Sanitary Engineering, chapter 9
- Septic tank and soak pit, 15 users · Sanitary Engineering, chapter 9 · asked 2×
- Septic tank and soak pit, 10 users, 85 l/m²/d · Sanitary Engineering, chapter 9 · asked 2×
- VIP latrine; septic tank for 15 users · Sanitary Engineering, chapter 9
- Septic tank and soak pits, 15 users, Terai · Sanitary Engineering, chapter 9
- Septic tank for 15 users · Sanitary Engineering, chapter 9
- Septic tank with soak pit: excavation, floor, plaster · Estimating and Costing, chapter 6
- Brickwork of a septic tank · Estimating and Costing, chapter 6
- Septic tank and soak pit · Building Technology, chapter 12 · asked 7×
- Building services, septic tank and soak pit · Building Technology, chapter 12