Skip to main content

Septic tank and dispersion trench, 12 persons

Short answer

Sewage flow 0.672 m³/d; septic tank volume 2.20 m³ (settling 0.672 + digestion 0.510 + storage 1.020), size 2.1×0.7×1.5 m. Infiltration area 672/30 = 22.4 m²; trench width 0.6 m, total length 37.3 m, so two 19.0 m long trenches, 0.6 m wide, gravel bed and perforated pipe.

Assuming 80% contribution of water supply for the sewage, design septic tank and dispersion trenches for a house having 12 persons with an average water supply rate of 70 lpcd. The desludging period of septic tank is 3 years. The infiltration capacity of soil is 30 l/m²/d.

Given: 12 persons, water supply 70 L/c/d, sewage = 80% of supply, desludging every 3 years, infiltration 30 L/m²/d.

Septic tank

  • Sewage flow: Q=12×70×0.8 L/c/d=672 L/d=0.672 m3/dQ = 12 \times 70\times0.8\ \text{L/c/d} = 672\ \text{L/d} = 0.672\ \text{m}^3\text{/d}
  • Sewage (settling) zone for 24 h detention: V1=0.672 m3V_1 = 0.672\ \text{m}^3
  • Sludge digestion zone: 0.0425×12=0.510 m30.0425 \times 12 = 0.510\ \text{m}^3
  • Digested sludge storage for 3 years: (0.085/3)×3×12=1.020 m3(0.085/3) \times 3 \times 12 = 1.020\ \text{m}^3
V=0.672+0.510+1.020=2.20 m3V = 0.672 + 0.510 + 1.020 = 2.20\ \text{m}^3

Adopt liquid depth d=1.5d = 1.5 m and L:B≈3:1L:B \approx 3:1.

Plan area=2.20/1.5=1.47 m2B=1.47/3≈0.7 m,L=1.47/0.7≈2.1 m\begin{aligned} \text{Plan area} &= 2.20/1.5 = 1.47\ \text{m}^2 \\ B &= \sqrt{1.47/3} \approx 0.7\ \text{m}, \quad L = 1.47/0.7 \approx 2.1\ \text{m} \end{aligned}

Check: 2.1×0.7×1.5=2.21 m3≥2.20 m32.1 \times 0.7 \times 1.5 = 2.21\ \text{m}^3 \ge 2.20\ \text{m}^3 (safe).

Septic tank: internal size 2.1 m×0.7 m×1.8 m2.1\ \text{m} \times 0.7\ \text{m} \times 1.8\ \text{m} (including 0.3 m free board), in two chambers: first chamber 1.401.40 m long (2/3), second 0.700.70 m (1/3), separated by a partition wall with an opening near mid-depth. Inlet and outlet through T-pipes dipping 0.3 m below water level.

Dispersion trenches

  • Infiltration area: A=672/30=22.40 m2A = 672/30 = 22.40\ \text{m}^2 (trench bottom area)
  • Trench width w=0.6w = 0.6 m, so total length =22.40/0.6=37.3= 22.40/0.6 = 37.3 m
  • The maximum length per trench is about 30 m, so adopt 2 trenches, each 19.0 m long (22.8 m² provided), 0.6 m wide and 0.6-1.0 m deep, laid at a grade of 1 in 200 to 1 in 300, at 2 m centre-to-centre spacing.

Each trench has a 0.3 m deep layer of gravel (20-40 mm) with a 100 mm perforated (or open-jointed) distribution pipe laid in it, covered with 50 mm of coarse sand/gravel, a filter layer such as geotextile or straw, and then soil. Effluent is fed from a distribution box.