Skip to main content

Two-stage trickling filter, 7665 m³/day

Short answer

After 35% primary removal, applied BOD is 123.5 mg/l, overall filter efficiency 79.76%. Assuming equal stage efficiencies of 55.01%, recirculation factor 1.3605, volumes 204.3 m³ and 454.1 m³ yield diameters 11.9 m and 17.7 m.

A municipal wastewater having a BOD5 of 190 mg/l is to be treated by a two stage trickling filter. The desired BOD5, 20°C of the final effluent is to be 25 mg/l. If both the filter's depth is to be 1.85 m and recirculation ratio for both filters is 0.5, determine the required filter diameters. Assume the wastewater flow rate of 7665 m³/day, and 35% BOD is removed in primary sedimentation tank.

Data: Q=7665Q=7665 m³/day; raw BOD5=190_5=190 mg/l; 35% removed in the primary sedimentation tank, so BOD to the filters =190×0.65=123.5=190\times0.65=123.5 mg/l; final BOD =25=25 mg/l; depth =1.85=1.85 m; R=0.5R=0.5 for both filters.

Data and approach

Two-stage filter (NRC equations, WW in kg/day, VV in m³):

E1=1001+0.4432W1V1F,E2=1001+0.44321−E1W2V2F,F=1+R(1+0.1R)2E_1=\frac{100}{1+0.4432\sqrt{\dfrac{W_1}{V_1F}}},\qquad E_2=\frac{100}{1+\dfrac{0.4432}{1-E_1}\sqrt{\dfrac{W_2}{V_2F}}},\qquad F=\frac{1+R}{(1+0.1R)^2}

where W2=W1(1−E1)W_2=W_1(1-E_1) is the BOD load leaving the first stage (E1E_1 as a fraction in the second equation). Flow Q=7665Q=7665 m³/day.

Step 1: Loads and efficiencies

BOD applied=123.5 mg/l,W1=7665×123.5×10−3=946.6 kg/dayOverall filter efficiency E=123.5−25123.5=0.7976\begin{aligned} BOD\ \text{applied} &= 123.5\ \text{mg/l},\quad W_1=7665\times 123.5\times10^{-3}=946.6\ \text{kg/day}\\ \text{Overall filter efficiency } E &= \frac{123.5-25}{123.5}=0.7976 \end{aligned}

No ratio is given, so both stages are taken to have equal efficiency E1=E2=EE_1=E_2=E: 1−(1−E)2=0.7976⇒E=1−1−0.7976=0.55011-(1-E)^2=0.7976\Rightarrow E=1-\sqrt{1-0.7976}=0.5501, i.e. E1=E2=55.01%E_1=E_2=55.01\%.

Step 2: Recirculation factor (same for both stages, R=0.5R=0.5)

F=1+0.5(1+0.1×0.5)2=1.3605F=\frac{1+0.5}{(1+0.1\times 0.5)^2}=1.3605

Step 3: First stage

W1V1F=100/E1−10.4432=1.8455 ⇒ V1=946.61.3605×1.84552=204.3 m3\sqrt{\frac{W_1}{V_1F}}=\frac{100/E_1-1}{0.4432}=1.8455\ \Rightarrow\ V_1=\frac{946.6}{1.3605\times 1.8455^2}=204.3\ \text{m}^3

Step 4: Second stage

W2=W1(1−E1)=946.6×(1−0.5501)=425.9 kg/dayW2V2F=(100/E2−1)(1−E1)0.4432=0.8303 ⇒ V2=425.91.3605×0.83032=454.1 m3\begin{aligned} W_2 &= W_1(1-E_1)=946.6\times(1-0.5501)=425.9\ \text{kg/day}\\ \sqrt{\frac{W_2}{V_2F}} &= \frac{(100/E_2-1)(1-E_1)}{0.4432}=0.8303\ \Rightarrow\ V_2=\frac{425.9}{1.3605\times 0.8303^2}=454.1\ \text{m}^3 \end{aligned}

Step 5: Diameters (depth 1.851.85 m)

D1=4V1π d=4×204.3π×1.85=11.9 m,D2=4×454.1π×1.85=17.7 mD_1=\sqrt{\frac{4V_1}{\pi\,d}}=\sqrt{\frac{4\times 204.3}{\pi\times 1.85}}=11.9\ \text{m},\qquad D_2=\sqrt{\frac{4\times 454.1}{\pi\times 1.85}}=17.7\ \text{m}

Answer: first-stage filter D1≈11.9D_1\approx 11.9 m (volume 204.3 m³); second-stage filter D2≈17.7D_2\approx 17.7 m (volume 454.1 m³).

✓ Answer checked by Claude Opus 5.5 (high effort)

All Sanitary Engineering chapter 7 questions →