- 2064 Shrawan (old course) · 8 marks
Route location in hill road design
Short answer
Route location identifies control points, studies maps and aerial photos, and conducts ground reconnaissance. The alignment is chosen on stable, sunny slopes, with gradient near 5%, minimal stream crossings, balanced earthwork, and avoidance of unstable zones. Ridge, mid-slope or valley routes are compared for cost and stability.
Explain briefly about the route location in hill road design.
Route location in hill roads is the process of choosing a stable, economical alignment between the fixed end points over difficult, steep and unstable terrain.
Steps
- Identify control points - the end points, mountain passes, saddles, bridge sites on rivers, settlements and market centres, and points to avoid (landslide zones, unstable slopes, forests, religious sites).
- Study of maps and photographs - topographical maps, aerial photographs, satellite imagery and geological maps give possible routes.
- Reconnaissance - walk the corridor to assess slope, geology, drainage, water sources and construction material.
- Selection of route - the choice between a ridge, a mid-hill or a valley (river) route according to the following.
| Route | Merit | Demerit |
|---|---|---|
| Ridge | stable, few drains | long, hard to serve villages |
| Mid-slope | balanced and common | needs walls and cuts |
| Valley | gentle gradient | flood, bank erosion, many tributary crossings |
Main principles of hill road location
- Prefer sunny, stable and dry slopes; avoid shaded, wet slopes.
- Gradient near the ruling gradient (5%; limiting 6%); use hairpins only to gain height (spaced well, on stable ground).
- Keep the cross-drainage crossings as few as possible and at the best sites (right angle to the flow).
- Keep cut and fill balanced and the cutting height lower than the stability limit; avoid deep cuts and high fills.
- Avoid landslides, scree, rock falls, springs and unstable geology.
- Take minimum land and environmental damage, and keep the cost low for construction and maintenance.
- Provide for future widening and stage construction (NRS 2070 recommends the engineering survey followed by a detailed geotechnical study).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Special considerations in hill road design · Transportation Engineering I, chapter 5 · asked 5×
- Define hill road and design factors · Transportation Engineering I, chapter 5 · asked 2×
- Structure of route location process · Transportation Engineering I, chapter 2 · asked 5×
- Principle and complexities of route location · Transportation Engineering I, chapter 2
- River route location considerations · Transportation Engineering I, chapter 5 · asked 2×
- Hill road drainage structures · Transportation Engineering I, chapter 5 · asked 4×
- Hill road earthwork, 0+020 to 0+140 · Estimating and Costing, chapter 6 · asked 2×
- Hill road earthwork, 0 m to 90 m, 10/8 m widths · Estimating and Costing, chapter 6 · asked 2×
- Objectives of investigation for hill road · Engineering Geology I, chapter 1
- Hill road earthwork, chainage 130-280 · Estimating and Costing, chapter 6