With 4 min retention, volume = 15×240 = 3600 m³, area 75 m², depth 7.4 m. Forebay 48 m long × 10.5 m wide × 7.4 m deep.

Design a forebay using the following data: Q = 15 m³/s; storage requirement = 4 minutes; length of penstock = 500 m; diameter of penstock = 2 m.

Given: Q=15.0Q=15.0 m³/s; 1 penstock (assumed) of diameter 2.0 m and length 500 m; storage (retention) time 4 min; limiting velocity in the forebay 0.20 m/s (assumed, the usual limit, as it is not given).

Step 1: Volume of the forebay

The forebay stores the water for the retention time:

V=Q t=15.0×(4×60)=3600 m3V=Q\,t=15.0\times(4\times60)=3600\ \text{m}^3

Step 2: Cross-sectional area from the velocity limit

A=Qv=15.00.20=75.0 m2A=\frac{Q}{v}=\frac{15.0}{0.20}=75.0\ \text{m}^2

Step 3: Depth of water (submergence of the penstock intake)

Velocity in the penstock: Vp=Qπ4D2=4.775V_p=\dfrac{Q}{\frac{\pi}{4}D^2}=4.775 m/s. Minimum submergence to avoid vortices (Gordon, with C=0.7245C=0.7245 for an asymmetrical approach, which is on the safe side):

S=0.7245 VpD=0.7245×4.775×2.0=4.89 mS=0.7245\,V_p\sqrt{D}=0.7245\times4.775\times\sqrt{2.0}=4.89\ \text{m}

Water depth = S+D+S+D+ bottom clearance of 0.5 m =4.89+2.0+0.5=7.39=4.89+2.0+0.5=7.39 m, adopt H=7.4H=7.4 m.

Step 4: Width and length

B=AH=75.07.4=10.14 m,L=VA=360075.0=48.0 mB=\frac{A}{H}=\frac{75.0}{7.4}=10.14\ \text{m},\qquad L=\frac{V}{A}=\frac{3600}{75.0}=48.0\ \text{m}

Adopt B=10.5B=10.5 m and L=48L=48 m (the volume is then B L H=3730B\,L\,H=3730 m³ ≥V\ge V).

The penstock length (500 m) is not needed to size the forebay by this method; it matters for the penstock head loss and the water hammer.

PLAN
 headrace        forebay                 penstock
 tunnel/canal  +------------------+
 ====> \       |                  |
        \ trans| trash rack       |==> penstock
 ====> /       |                  |
              +--+-spillway-+-flush+
                   |          |
                   v          v  to river (spillway/flushing)

SECTION
 canal bed ____ WL ~~~~~~~~~~~~~~~~~~~~~~
                  |        S (submergence)
                  |   rack  ____ crown
                  |   ####  \   penstock
 flushing  ______ |___####____\_D__
 bottom clearance 0.5 m
ItemValue
Storage volume3600 m³
Water depth7.4 m (+0.5 m free board)
Width10.5 m
Length48 m
Submergence of penstock crown4.89 m

Answer: forebay about 48 m long x 10.5 m wide x 7.4 m deep (water), with a volume of 3600 m³.