- 2079 Baishakh · 6 marks
Forebay design (14.5 m³/s, two penstocks)
Short answer
Volume 2610 m³, area 65.9 m², depth 5.1 m. Forebay 40 m long × 13 m wide × 5.1 m deep.
Design a forebay structure with turbine discharge of 14.5 m³/s with two penstocks 1.8 m diameter each. Take retention time 3 minutes and limiting velocity 0.22 m/s. Draw neat sketch of plan and section.
Given: m³/s; 2 penstocks of diameter 1.8 m; retention (detention) time 3 min; limiting velocity in the forebay 0.22 m/s.
Step 1: Volume of the forebay
The forebay stores the water for the retention time:
Step 2: Cross-sectional area from the velocity limit
Step 3: Depth of water (submergence of the penstock intake)
Velocity in each penstock: m/s. Minimum submergence to avoid vortices (Gordon, with for an asymmetrical approach, which is on the safe side):
Water depth = bottom clearance of 0.5 m m, adopt m.
Step 4: Width and length
Adopt m and m (the volume is then m³ ).
PLAN
headrace forebay penstocks
tunnel/canal +------------------+
====> \ | |==> penstock 1
\ trans| trash rack |
====> / | |==> penstock 2
+--+-spillway-+-flush+
| |
v v to river (spillway/flushing)
SECTION
canal bed ____ WL ~~~~~~~~~~~~~~~~~~~~~~
| S (submergence)
| rack ____ crown
| #### \ penstock
flushing ______ |___####____\_D__
bottom clearance 0.5 m
| Item | Value |
|---|---|
| Storage volume | 2610 m³ |
| Water depth | 5.1 m (+0.5 m free board) |
| Width | 13.0 m |
| Length | 40 m |
| Submergence of penstock crown | 2.77 m |
Answer: forebay about 40 m long x 13.0 m wide x 5.1 m deep (water), with a required volume of 2610 m³.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Forebay design considerations; design for 12 m³/s · Hydropower Engineering, chapter 6
- Forebay design with spillway length (14 m³/s) · Hydropower Engineering, chapter 6
- Forebay design (15 m³/s, 4 minutes) · Hydropower Engineering, chapter 6
- Forebay dimension for 3 minutes storage · Hydropower Engineering, chapter 6
- Forebay design (20 m³/s, 300 m penstock) · Hydropower Engineering, chapter 6
- Pelton turbine design (312.5 m, 5 m³/s) · Hydropower Engineering, chapter 7
- Guide bund with plan, section, nose; 2500 m3/s · Irrigation and Drainage Engineering, chapter 6
- Settling velocity of discrete particle 0.14 mm at 25°C · Water Supply Engineering, chapter 6 · asked 2×
- Kaplan turbine discharge and blade angles · Fluid Machines, chapter 3
- Velocity and discharge, 1.8 m sewer · Sanitary Engineering, chapter 3