- 2074 Ashwin · 10 marks
Overflow section stability with gates and piers
Short answer
Overturning factor of safety 1.39 (below 1.5, not safe). Sliding by friction alone 0.77 (not safe); shear-friction factor 4.96 (safe). No tension occurs (heel compressive stress 88.9 kN/m²). Overall, the section needs widening or improved drainage for overturning.
Check the stability of the overflow section of the gravity dam shown in the figure. Assume the weight of concrete, gates, piers and weight of water over the crest, kN. Moment of weight of concrete, gates, piers and water above the crest etc. about toe kN-m. Neglect all forces other than weight, uplift pressure and water pressure. Also check for tension. Take μ = 0.75 and q = 1400 kN/m². [Figure: overflow section with base at RL 100.0 m, crest at RL 140.0 m, reservoir water level RL 160.0 m, tail water level RL 120.0 m; drainage gallery 8 m from the upstream face; base width 47 m; 18 m dimension on the downstream side.]
Data
Base RL 100 m and reservoir RL 160 m, so m; tail water RL 120 m, so m; m; kN/m³; ; unit shear strength of the dam-foundation contact kN/m². Total vertical load of the concrete, gates, piers and water over the crest: kN with a moment about the toe of kN·m, so it acts at m from the toe. Other loads (tail water weight, earthquake, silt) are neglected, as stated.
160 ~~~~~~~\ reservoir RL 160
140 -------+==crest (overflow) RL 140
| \
| G \
| \
120 ........| \~~~ tail water RL 120
100 --------+------\
heel toe B = 47 m
Uplift: with the gallery 8 m from the u/s face, the pressure drops from kN/m² at the heel to kN/m² at the gallery, and to kN/m² at the toe.
Forces and moments about the toe
| Force | Magnitude (kN/m) | Arm from toe (m) | Moment about toe (kN·m/m) |
|---|---|---|---|
| Vertical (resisting) | |||
| W_total (concrete, gates, piers, water on crest) | 30,000.0 | 33.33 | 1,000,000 |
| ΣW (downward) | 30,000.0 | 1,000,000 | |
| Horizontal / uplift (overturning) | |||
| Water thrust | 17,658.0 | 20.00 | 353,160 |
| Uplift part 1 (upward) | 2,616.0 | 43.00 | 112,488 |
| Uplift part 2 (upward) | 1,046.4 | 44.33 | 46,390 |
| Uplift part 3 (upward) | 7,651.8 | 19.50 | 149,210 |
| Uplift part 4 (upward) | 2,550.6 | 26.00 | 66,316 |
| Uplift U | 13,864.8 | ||
| Tail water thrust (resisting) | 1,962.0 | 6.67 | 13,080 |
| Total overturning | ΣM_O = 727,564 |
Checks
- kN/m
- kN/m
- kN·m/m; kN·m/m
Overturning: — below the usual 1.5, so not safe.
Sliding (friction only): — not safe (< 1).
Sliding (shear-friction factor, using ):
This is above the usual 3-5, so the section is safe in sliding when the shear strength of the joint is counted.
Resultant: m from the toe; m; m, so the resultant is inside the middle third: no tension.
The heel stress is compressive, so there is no tension, and the toe stress (598 kN/m²) is moderate.
Conclusion: the section has no tension and is safe in sliding by the shear-friction factor (SFF = 4.96), although friction alone (0.77) would not be enough. The factor of safety against overturning (1.39) is below the usual 1.5; since the resultant lies inside the middle third, the section is acceptable against overturning only if 1.39 is allowed, otherwise the base should be widened or the uplift reduced by better drainage.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Gravity dam forces and stability checks (2081 Baishakh) · Hydropower Engineering, chapter 4
- Gravity dam section: shear stress near toe (2082) · Hydropower Engineering, chapter 4
- Gravity dam stability and shear stress at toe (2081) · Hydropower Engineering, chapter 4
- Gravity dam stability (SG 2.4, RL 0-70) · Hydropower Engineering, chapter 4
- Gravity dam stability with seismic load · Hydropower Engineering, chapter 4
- Gravity dam stability: flotation, overturning, sliding · Hydropower Engineering, chapter 4
- Stability of gravity dam (crest 1530 m) · Hydro Power, chapter 4
- Sliding and overturning check of gravity dam · Hydro Power, chapter 4
- Elementary profile and 40 m gravity dam stability · Hydro Power, chapter 4
- Forces on gravity dam and stability requirements · Hydro Power, chapter 4