Hydraulic jump stilling basin at spillway toe

Short answer

Head 2.86 m, y1=0.384 m, y2=7.10 m, Fr1=13.42; floor depressed 1.10 m to RL 63.90 m; basin length 37 m.

Design a hydraulic jump stilling basin at the toe of the spillway with the following data: discharge = 80 m³/s; width of the spillway = 8 m; spillway crest level = 96.00 m; river bed level = 65.00 m; tail water level = 71.00 m; coefficient of discharge = 0.7; downstream bed slope (i) = 1:500 and Manning's roughness coefficient = 0.016; ratio of length of stilling basin and sequent depth = 5.1.

Given: Q=80Q=80 m³/s, width B=8B=8 m, crest RL 96.00 m, river bed RL 65.00 m, tail water RL 71.00 m (depth yTW=6y_{TW}=6 m), Cd=0.7C_d=0.7, bed slope 1:500, n=0.016n=0.016 (not needed because the tail water is given), L/y2=5.1L/y_2=5.1.

Step 1: Unit discharge and head on crest

q=808=10 m3/s/m,q=23Cd2g H3/2⇒10=23(0.7)(4.429)H3/2⇒H=2.86 mq=\frac{80}{8}=10\ \text{m}^3/\text{s/m},\qquad q=\tfrac23C_d\sqrt{2g}\,H^{3/2}\Rightarrow10=\tfrac23(0.7)(4.429)H^{3/2}\Rightarrow H=2.86\ \text{m}

Step 2: Conditions at the toe (floor at river-bed level)

Fall of crest =96−65=31=96-65=31 m, so the specific energy at the toe (losses neglected) E=31+H=33.86E=31+H=33.86 m.

y1+q22g y12=E ⇒ y1=0.390 m,V1=25.6 m/s,Fr1=V1gy1=13.10y_1+\frac{q^2}{2g\,y_1^2}=E\ \Rightarrow\ y_1=0.390\ \text{m},\quad V_1=25.6\ \text{m/s},\quad Fr_1=\frac{V_1}{\sqrt{gy_1}}=13.10 y2=y12(1+8Fr12−1)=7.04 my_2=\frac{y_1}{2}\left(\sqrt{1+8Fr_1^2}-1\right)=7.04\ \text{m}

The tail water depth (6.0 m) is less than y2=7.04y_2=7.04 m, so the jump would be swept away. The floor must be depressed.

Step 3: Depress the floor by zz

With the floor lowered by zz: E=31+z+HE=31+z+H and tail-water depth over the floor =6+z=6+z. Condition 6+z=y2(z)6+z=y_2(z); by trial:

zz (m)EE (m)y1y_1 (m)Fr1Fr_1y2y_2 (m)6+z6+z (m)
033.860.39013.107.046.00
1.1034.960.38413.427.107.10

Depression z≈1.10z\approx1.10 m, so floor RL =65−1.10=63.90=65-1.10=63.90 m (say RL 63.90 m).

Step 4: Length of basin

L=5.1 y2=5.1×7.10=36.2 m ⇒ adopt 37 mL=5.1\,y_2=5.1\times7.10=36.2\ \text{m}\ \Rightarrow\ \text{adopt }37\ \text{m}

Step 5: Appurtenances

  • Chute blocks at the toe, height and width ≈y1=0.384\approx y_1=0.384 m (say 0.4 m), alternating with equal gaps.
  • End sill of height ≈0.2y2=1.42\approx0.2y_2=1.42 m; Fr1=13.42>4.5Fr_1=13.42>4.5 and V1=26.0V_1=26.0 m/s >18>18 m/s, so a USBR Type II layout (chute blocks and dentated end sill) is used.
  • Training walls up to 1.2y21.2y_2 above floor, and riprap protection downstream of the end sill.
 crest 96.0 ____
           \ \
            \ \__[chute blocks]__________[sill]__
 bed 65.0 ===\ _ _ _ _ _ _ _ _ _ _ _ _ _ _/===== TWL 71.0
 floor 63.90     |<------ L = 37 m ------>|

Answer: H=2.86H=2.86 m, y1=0.384y_1=0.384 m, y2=7.10y_2=7.10 m, Fr1=13.42Fr_1=13.42; floor depressed by 1.10 m to RL 63.90 m, basin length 37 m.