- 2070 Chaitra · 9 marks
Hydraulic jump stilling basin at spillway toe
Short answer
Head 2.86 m, y1=0.384 m, y2=7.10 m, Fr1=13.42; floor depressed 1.10 m to RL 63.90 m; basin length 37 m.
Design a hydraulic jump stilling basin at the toe of the spillway with the following data: discharge = 80 m³/s; width of the spillway = 8 m; spillway crest level = 96.00 m; river bed level = 65.00 m; tail water level = 71.00 m; coefficient of discharge = 0.7; downstream bed slope (i) = 1:500 and Manning's roughness coefficient = 0.016; ratio of length of stilling basin and sequent depth = 5.1.
Given: m³/s, width m, crest RL 96.00 m, river bed RL 65.00 m, tail water RL 71.00 m (depth m), , bed slope 1:500, (not needed because the tail water is given), .
Step 1: Unit discharge and head on crest
Step 2: Conditions at the toe (floor at river-bed level)
Fall of crest m, so the specific energy at the toe (losses neglected) m.
The tail water depth (6.0 m) is less than m, so the jump would be swept away. The floor must be depressed.
Step 3: Depress the floor by
With the floor lowered by : and tail-water depth over the floor . Condition ; by trial:
| (m) | (m) | (m) | (m) | (m) | |
|---|---|---|---|---|---|
| 0 | 33.86 | 0.390 | 13.10 | 7.04 | 6.00 |
| 1.10 | 34.96 | 0.384 | 13.42 | 7.10 | 7.10 |
Depression m, so floor RL m (say RL 63.90 m).
Step 4: Length of basin
Step 5: Appurtenances
- Chute blocks at the toe, height and width m (say 0.4 m), alternating with equal gaps.
- End sill of height m; and m/s m/s, so a USBR Type II layout (chute blocks and dentated end sill) is used.
- Training walls up to above floor, and riprap protection downstream of the end sill.
crest 96.0 ____
\ \
\ \__[chute blocks]__________[sill]__
bed 65.0 ===\ _ _ _ _ _ _ _ _ _ _ _ _ _ _/===== TWL 71.0
floor 63.90 |<------ L = 37 m ------>|
Answer: m, m, m, ; floor depressed by 1.10 m to RL 63.90 m, basin length 37 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Hydraulic jump stilling basin (28 m³/s/m) · Hydropower Engineering, chapter 4
- Is a hydraulic jump stilling basin required? · Hydropower Engineering, chapter 4
- Hydraulic jump stilling basin (25 m³/s/m) · Hydropower Engineering, chapter 4
- USBR stilling basin design (80 m³/s) · Hydropower Engineering, chapter 4
- Stilling basin invert level and USBR type · Hydropower Engineering, chapter 4
- Discharge from hydraulic jump depths 1.5 m to 4 m · Hydropower Engineering, chapter 4
- Jump at spillway toe; repelled and submerged jump · Hydraulics, chapter 9
- Vertical drop crest level and width, Q 30 · Irrigation and Drainage Engineering, chapter 7
- Hydraulic jump definition and downstream Froude number · Hydraulics, chapter 9
- Slope-area flood discharge, Marin River at Kusuntar · Engineering Hydrology, chapter 4