- 2078 Bhadra · 10 marks
Stilling basin invert level and USBR type
Short answer
Floor invert RL 14.27 m. y1=1.011 m, y2=10.73 m, Fr1=7.85. USBR Type II basin length 47 m, chute blocks 1.0 m, dentated end sill 2.15 m.
The discharge of water over a spillway 12 m wide is 300 m³/s into a stilling basin of the same width. The lake level behind the spillway has an elevation of 50 m and the river water surface elevation downstream of the stilling basin is 25 m. Assume a 10% energy loss in flow down the spillway, find the invert level elevation of the floor of the stilling basin so that a hydraulic jump forms in the basin. Select an appropriate USBR stilling basin and list all the dimensions.
Given: m³/s, width m, so m³/s/m; lake level RL 50 m; tail water level RL 25 m; 10% of the energy is lost on the spillway.
Let be the RL of the basin floor. Then the energy at the toe above the floor is
and the jump forms at the toe if the tail water depth equals the sequent depth:
Solution by trial
| Floor RL (m) | (m) | (m) | (m) | (m) | |
|---|---|---|---|---|---|
| 12.0 | 34.20 | 0.979 | 8.24 | 10.93 | 22.93 |
| 16.0 | 30.60 | 1.038 | 7.55 | 10.57 | 26.57 |
| 14.27 | 32.16 | 1.011 | 7.85 | 10.73 | 25.00 |
The condition is met for
Selection of the USBR basin
, m/s m/s and m³/s/m, so a Type II basin is suitable (Type III is limited to m/s; Type IV is for ).
| Dimension | Value |
|---|---|
| Basin floor (invert) level | RL 14.27 m |
| Basin length | 46.1 m, say 47 m |
| Chute blocks: height = width = spacing | 1.011 m, say 1.0 m |
| Dentated end sill: height | 2.15 m |
| End sill tooth width and spacing | 1.61 m |
| Tail water depth over floor | 10.73 m (= ) |
| Width of basin | 12 m (same as spillway) |
| Training walls | freeboard, i.e. about 12 m above floor |
lake 50 ___
\ \
\ \__[chute blocks]______[dentated sill]
floor 14.27 \_|#|#|#|_______________|^|^|^|^|====> TWL 25
|<-------- L = 47 m -------->|
Answer: floor invert RL 14.27 m; USBR Type II basin, length about 47 m, chute blocks 1.0 m, dentated end sill 2.15 m, with m and m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- USBR stilling basin design (80 m³/s) · Hydropower Engineering, chapter 4
- Hydraulic jump stilling basin at spillway toe · Hydropower Engineering, chapter 4
- Hydraulic jump stilling basin (25 m³/s/m) · Hydropower Engineering, chapter 4
- Minimum length of concrete apron of stilling basin · Hydropower Engineering, chapter 4
- Hydraulic jump stilling basin (28 m³/s/m) · Hydropower Engineering, chapter 4
- Is a hydraulic jump stilling basin required? · Hydropower Engineering, chapter 4
- Discharge over overflow spillway · Hydro Power, chapter 6
- Discharge of triangular river from surface velocities · Engineering Hydrology, chapter 4
- Water surface over hump with contraction · Hydraulics, chapter 7
- Slope-area flood discharge, Marin River at Kusuntar · Engineering Hydrology, chapter 4