- 2081 Baishakh · 6 marks
Is a hydraulic jump stilling basin required?
Short answer
Required. Conjugate depth y2=6.97 m; tailwater depth 2.75 m is much smaller. Use USBR Type II basin, depress floor, length approx 30 m.
Check whether a hydraulic jump type stilling basin is required or not for a hydropower project. Given that the discharge is 100 cumec flowing through a 10 m long overflow spillway. The height of the spillway crest is 30 m from the downstream bed with a slope of river as 1 in 500, Manning's roughness coefficient is 0.018 and coefficient of discharge is 0.75.
A hydraulic jump basin is needed if the natural tail water depth is less than the conjugate (sequent) depth needed to hold the jump at the toe.
Given: m³/s, spillway width m, height of crest above d/s bed m, , , . The river downstream is assumed rectangular with the same width.
Step 1: Unit discharge and head
Step 2: Depth and velocity at the toe
m (losses neglected).
Step 3: Required tail water (sequent depth)
Step 4: Available tail water (Manning)
For the 10 m wide channel carrying 100 m³/s with and :
(Check: m², m, m³/s.)
Step 5: Decision
The available tail water is much smaller than the required sequent depth, so the jump would be swept far downstream and the d/s bed would be scoured.
Answer: a stilling basin is required. The floor must be depressed (or a sill/baffle arrangement provided) to give a tail water depth of about m; since and m/s, a USBR Type II basin of length about m is suitable.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Hydraulic jump stilling basin at spillway toe · Hydropower Engineering, chapter 4
- Hydraulic jump stilling basin (25 m³/s/m) · Hydropower Engineering, chapter 4
- Hydraulic jump stilling basin (28 m³/s/m) · Hydropower Engineering, chapter 4
- Discharge through chute spillway ogee crest · Hydropower Engineering, chapter 4
- Minimum length of concrete apron of stilling basin · Hydropower Engineering, chapter 4
- Discharge from hydraulic jump depths 1.5 m to 4 m · Hydropower Engineering, chapter 4
- Discharge over overflow spillway · Hydro Power, chapter 6
- Hydraulic jump definition and downstream Froude number · Hydraulics, chapter 9
- Bump followed by hydraulic jump, find bump height · Hydraulics, chapter 9 · asked 2×
- Jump at spillway toe; repelled and submerged jump · Hydraulics, chapter 9