Is a hydraulic jump stilling basin required?

Short answer

Required. Conjugate depth y2=6.97 m; tailwater depth 2.75 m is much smaller. Use USBR Type II basin, depress floor, length approx 30 m.

Check whether a hydraulic jump type stilling basin is required or not for a hydropower project. Given that the discharge is 100 cumec flowing through a 10 m long overflow spillway. The height of the spillway crest is 30 m from the downstream bed with a slope of river as 1 in 500, Manning's roughness coefficient is 0.018 and coefficient of discharge is 0.75.

A hydraulic jump basin is needed if the natural tail water depth is less than the conjugate (sequent) depth y2y_2 needed to hold the jump at the toe.

Given: Q=100Q=100 m³/s, spillway width B=10B=10 m, height of crest above d/s bed P=30P=30 m, S0=1/500S_0=1/500, n=0.018n=0.018, Cd=0.75C_d=0.75. The river downstream is assumed rectangular with the same width.

Step 1: Unit discharge and head

q=10010=10 m3/s/m,10=23(0.75)(4.429)H3/2⇒H=2.73 mq=\frac{100}{10}=10\ \text{m}^3/\text{s/m},\qquad 10=\tfrac23(0.75)(4.429)H^{3/2}\Rightarrow H=2.73\ \text{m}

Step 2: Depth and velocity at the toe

E=P+H=30+2.73=32.73E=P+H=30+2.73=32.73 m (losses neglected).

y1+q22gy12=32.73⇒y1=0.397 m,V1=25.2 m/s,Fr1=12.76y_1+\frac{q^2}{2gy_1^2}=32.73\Rightarrow y_1=0.397\ \text{m},\quad V_1=25.2\ \text{m/s},\quad Fr_1=12.76

Step 3: Required tail water (sequent depth)

y2=y12(1+8Fr12−1)=6.97 my_2=\frac{y_1}{2}\left(\sqrt{1+8Fr_1^2}-1\right)=6.97\ \text{m}

Step 4: Available tail water (Manning)

For the 10 m wide channel carrying 100 m³/s with S0=0.002S_0=0.002 and n=0.018n=0.018:

Q=1nAR2/3S01/2 ⇒ yn=2.75 mQ=\frac1nAR^{2/3}S_0^{1/2}\ \Rightarrow\ y_n=2.75\ \text{m}

(Check: A=27.5A=27.5 m², R=1.77R=1.77 m, Q=100.0Q=100.0 m³/s.)

Step 5: Decision

yn=2.75 m<y2=6.97 m(yn/y2=0.39)y_n=2.75\ \text{m}<y_2=6.97\ \text{m}\quad(y_n/y_2=0.39)

The available tail water is much smaller than the required sequent depth, so the jump would be swept far downstream and the d/s bed would be scoured.

Answer: a stilling basin is required. The floor must be depressed (or a sill/baffle arrangement provided) to give a tail water depth of about y2=6.97y_2=6.97 m; since Fr1=12.76>4.5Fr_1=12.76>4.5 and V1>18V_1>18 m/s, a USBR Type II basin of length about 4.3y2=30.04.3y_2=30.0 m is suitable.

✓ Answer checked by Claude Opus 5.5 (high effort)