Minimum length of concrete apron of stilling basin

Short answer

Minimum concrete apron length is 33 m: distance to jump start 14.4 m plus jump length 18.5 m.

Estimate the minimum length of the concrete apron (S0=0.001S_0 = 0.001) for a stilling basin downstream from an overflow spillway. The spillway crest is 15 m long and consider a discharge of 115 m³/s. Manning's roughness factor n = 0.025. Assume the stilling basin is the same width as the spillway crest. Assume any other suitable data if necessary. Refer to the figure below. [Figure: spillway of height 4 m with a stilling basin showing ycy_c, y0y_0, y1y_1, y2y_2, distance Δx\Delta x and jump length LjL_j; below it a curve of Lj/y2L_j / y_2 (4 to 6) against Froude number (2 to 5).]

Given: crest length B=15B=15 m, Q=115Q=115 m³/s, height of spillway P=4P=4 m, S0=0.001S_0=0.001, n=0.025n=0.025, basin width = 15 m. Losses on the spillway face are assumed negligible.

Step 1: Unit discharge and critical depth

q=11515=7.667 m3/s/m,yc=(q2g)1/3=1.816 mq=\frac{115}{15}=7.667\ \text{m}^3/\text{s/m},\qquad y_c=\left(\frac{q^2}{g}\right)^{1/3}=1.816\ \text{m}

Specific energy at the crest above the apron: E0=P+1.5yc=4+1.5(1.816)=6.72E_0=P+1.5y_c=4+1.5(1.816)=6.72 m.

Step 2: Supercritical depth y1y_1 at the toe

y1+q22gy12=6.72⇒y1=0.706 m,V1=10.87 m/s,Fr1=4.13y_1+\frac{q^2}{2gy_1^2}=6.72\Rightarrow y_1=0.706\ \text{m},\quad V_1=10.87\ \text{m/s},\quad Fr_1=4.13 y2=y12(1+8Fr12−1)=3.78 my_2=\frac{y_1}{2}\left(\sqrt{1+8Fr_1^2}-1\right)=3.78\ \text{m}

Step 3: Tail water depth y0y_0 (Manning, rectangular 15 m wide)

Q=1nAR2/3S01/2 ⇒ y0=3.43 m,V=2.24 m/s,Fr0=0.386Q=\frac1nAR^{2/3}S_0^{1/2}\ \Rightarrow\ y_0=3.43\ \text{m},\quad V=2.24\ \text{m/s},\quad Fr_0=0.386

Since y0=3.43 m<y2=3.78 my_0=3.43\ \text{m}<y_2=3.78\ \text{m}, the jump does not form at the toe. It moves downstream by a distance Δx\Delta x along the apron, to the section where the supercritical depth y1′y_1' has the conjugate depth y0y_0:

y1′=y02(1+8Fr02−1)=0.823 m(Fr1′=3.28)y_1'=\frac{y_0}{2}\left(\sqrt{1+8Fr_0^2}-1\right)=0.823\ \text{m}\quad(Fr_1'=3.28)

Step 4: Distance Δx\Delta x (gradually varied flow)

Friction makes the depth rise from y1=0.706y_1=0.706 m to y1′=0.823y_1'=0.823 m. By the direct step method, Δx=ΔES0−Sf‾\Delta x=\dfrac{\Delta E}{S_0-\overline{S_f}}, with Sf=(nVR2/3)2S_f=\left(\dfrac{nV}{R^{2/3}}\right)^2, summed over many small steps:

Δx=14.4 m\Delta x=14.4\ \text{m}

Step 5: Length of jump

For Fr1′=3.28Fr_1'=3.28, the curve of Lj/y2L_j/y_2 against FrFr gives Lj/y2≈5.4L_j/y_2\approx5.4 (here y2=y0y_2=y_0 is the tail water depth):

Lj=5.4×3.43=18.5 mL_j=5.4\times3.43=18.5\ \text{m}

Step 6: Minimum length of apron

L=Δx+Lj=14.4+18.5=32.9 mL=\Delta x+L_j=14.4+18.5=32.9\ \text{m}

Answer: the minimum length of the concrete apron is about 33 m (distance to the start of the jump 14.4 m + jump length 18.5 m).