- 2075 Chaitra · 10 marks
Minimum length of concrete apron of stilling basin
Short answer
Minimum concrete apron length is 33 m: distance to jump start 14.4 m plus jump length 18.5 m.
Estimate the minimum length of the concrete apron () for a stilling basin downstream from an overflow spillway. The spillway crest is 15 m long and consider a discharge of 115 m³/s. Manning's roughness factor n = 0.025. Assume the stilling basin is the same width as the spillway crest. Assume any other suitable data if necessary. Refer to the figure below. [Figure: spillway of height 4 m with a stilling basin showing , , , , distance and jump length ; below it a curve of (4 to 6) against Froude number (2 to 5).]
Given: crest length m, m³/s, height of spillway m, , , basin width = 15 m. Losses on the spillway face are assumed negligible.
Step 1: Unit discharge and critical depth
Specific energy at the crest above the apron: m.
Step 2: Supercritical depth at the toe
Step 3: Tail water depth (Manning, rectangular 15 m wide)
Since , the jump does not form at the toe. It moves downstream by a distance along the apron, to the section where the supercritical depth has the conjugate depth :
Step 4: Distance (gradually varied flow)
Friction makes the depth rise from m to m. By the direct step method, , with , summed over many small steps:
Step 5: Length of jump
For , the curve of against gives (here is the tail water depth):
Step 6: Minimum length of apron
Answer: the minimum length of the concrete apron is about 33 m (distance to the start of the jump 14.4 m + jump length 18.5 m).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Hydraulic jump stilling basin at spillway toe · Hydropower Engineering, chapter 4
- Is a hydraulic jump stilling basin required? · Hydropower Engineering, chapter 4
- Hydraulic jump stilling basin (28 m³/s/m) · Hydropower Engineering, chapter 4
- Hydraulic jump stilling basin (25 m³/s/m) · Hydropower Engineering, chapter 4
- Stilling basin invert level and USBR type · Hydropower Engineering, chapter 4
- Discharge through chute spillway ogee crest · Hydropower Engineering, chapter 4
- Discharge over overflow spillway · Hydro Power, chapter 6
- Crest width, cistern length of vertical drop, Q 1.55 · Irrigation and Drainage Engineering, chapter 7 · asked 2×
- Siphon aqueduct: Q 60, Manning 0.025 · Irrigation and Drainage Engineering, chapter 8
- Vertical drop crest level and width, Q 30 · Irrigation and Drainage Engineering, chapter 7