- 2079 Chaitra · 10 marks
Siphon aqueduct: Q 60, Manning 0.025
Short answer
Canal waterway is a flumed rectangular trough 24 m wide, 1.4 m deep, velocity 1.786 m/s. Bed levels at sections: 116.000 m (start), 115.907 m (trough start), 115.706 m (trough end), 115.741 m (end), total head loss 0.259 m.
Design following components of Siphon aqueduct for the following data: (i) canal water way, ii) Bed level at different sections of canal. Discharge of canal = 60 Cumecs; Bed width of canal = 30 m; Full supply depth of canal = 1.4 m; Bed level = 116 m; Side slope of canal = 1.5 H:1 V; High Flood discharge of drainage = 550 Cumecs; High flood level of drainage = 117 m; Bed level of drainage = 114 m; General ground level = 116 m; Manning's n = 0.025.
The canal ( = 60 m³/s) crosses a drainage of = 550 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Manning's = 0.025 (as given) is used for the friction loss in the trough; Lacey's = 1; piers 1.5 m thick.
1. Type of structure
HFL of the drainage (117.00 m) is above the canal bed (116.00 m) by 1.00 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 117.00 − 114.00 = 3.00 m.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 12 spans of 10 m with piers 1.5 m thick: clear waterway = 12 × 10 = 120 m (> 111.4 m). Overall length = 120 + 11 × 1.5 = 136.5 m.
Check: mean velocity = Q/(L·d) = 550/(120 × 3.00) = 1.53 m/s. Lacey's regime depth = 3.85 m (with = 1); foundations of piers and abutments are taken about 1.5R = 5.8 m below HFL, with cut-offs and aprons for scour.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (30 + 1.5 × 1.4) × 1.4 = 44.94 m², = 60/44.94 = 1.335 m/s, = 0.0909 m. Top width = 34.20 m.
To save cost, the canal is flumed to a rectangular trough of width = 24 m, with the same full supply depth 1.4 m (the trough is as long as the drainage waterway, 136.5 m).
- Trough area = 24 × 1.4 = 33.60 m²; = 60/33.60 = 1.786 m/s (acceptable, < 2.5 m/s); = 0.1625 m
- Froude number = 0.48 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 33.60/26.80 = 1.254 m; friction slope = 0.001474 (Manning's n = 0.025); friction loss in trough = 0.001474 × 136.5 = 0.201 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 34.20 − 24 = 10.2 m
- Outlet length = 3 × (T − B_t)/2 = 15.3 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 117.400 m, so = 117.307 m, = 117.106 m, = 117.141 m. Trough bed = water level − 1.4 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 116.000 | 117.400 |
| 2 | End of inlet transition = start of trough | 115.907 | 117.307 |
| 3 | End of trough = start of outlet transition | 115.706 | 117.106 |
| 4 | End of outlet transition = normal canal | 115.741 | 117.141 |
Total loss of head = 117.400 − 117.141 = 0.259 m, so the canal bed downstream of the work is 0.259 m lower than upstream.
Check: with trough slab 0.6 m thick, soffit of the barrels = 115.11 m, i.e. 1.11 m above the drainage bed; HFL stands 1.89 m above the soffit, which gives the siphonic head. Since the clear height is less than 1.5 m, the drainage bed is depressed under the barrels to RL 113.61 m (1.5 m clear height) with a 1 in 4 slope at both ends.
Answer: drainage waterway 120 m clear (12 × 10 m, overall 136.5 m); canal flumed to 24 m wide trough; bed/FSL at the four sections = 116.00/117.40, 115.91/117.31, 115.71/117.11, 115.74/117.14 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Siphon aqueduct: Q 60, bed 35 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Siphon aqueduct: Q 30, bed 24 m · Irrigation and Drainage Engineering, chapter 8
- Siphon aqueduct: Q 50, bed 32 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Siphon aqueduct: Q 30, drainage 800 · Irrigation and Drainage Engineering, chapter 8
- Siphon design: canal 18, drainage 60 · Irrigation and Drainage Engineering, chapter 8
- Siphon aqueduct: Q 20, drainage 200 · Irrigation and Drainage Engineering, chapter 8
- Canal earthwork, bed 3 m, free board 0.44 m · Estimating and Costing, chapter 6
- Critical depth in four channel sections · Hydraulics, chapter 7
- Surge and water hammer: 60 m³/s, 30 m surge tank · Hydropower Engineering, chapter 6 · asked 2×
- Slope-area discharge with three sections · Engineering Hydrology, chapter 4
All Irrigation and Drainage Engineering chapter 8 questions →