- 2075 Asoj · 8 marks
Flexible design: 4-lane single carriageway, 2000 CVPD
Short answer
Design ESAL = 32.7 × 10⁶. Provide asphalt concrete 125 mm, bituminous treated base 200 mm, granular sub-base 230 mm (total 555 mm) over subgrade CBR 6%.
Design the flexible pavement for 4-lane single carriage way road with the following parameters: i) Initial traffic in each direction = 2000 CVPD ii) Design life = 15 years iii) Construction period = 3 years iv) Traffic growth rate = 8% v) Design CBR value = 6% vi) Modulus of elasticity of asphalt concrete surface course = 2500 MPa vii) Modulus of elasticity of bituminous treated base = 1200 MPa viii) Modulus of elasticity of granular subbase course = 125 MPa ix) Axle load distribution of commercial vehicles on the road is as follows:
| Axle Load (kN) | No. of Axles (%) |
|---|---|
| 10 | 15 |
| 30 | 15 |
| 50 | 20 |
| 70 | 30 |
| 90 | 10 |
| 110 | 10 |
Given data and assumptions
- Four-lane single carriageway, initial traffic 2000 CVPD in each direction (4000 CVPD both ways), growth 8 %, design life 15 years, construction period 3 years, design CBR 6 %.
- Moduli: asphalt concrete 2500 MPa, bituminous treated base 1200 MPa, granular sub-base 125 MPa.
- Assumptions: each commercial vehicle has 2 axles on average; design lane carries 45 percent of the total two-way traffic (Asphalt Institute, four lanes); standard axle 80 kN and equivalency by the fourth power law.
- Method: Asphalt Institute (AI) thickness design as taught for IOE (and used in the Nepal DoR Pavement Design Guidelines); design reliability 90 percent, terminal serviceability 2.5.
Step 1 - Subgrade strength
Design CBR is given as 6 %.
Resilient modulus of subgrade: MPa.
Step 2 - Design traffic (ESAL)
Equivalent axle load factors from the axle distribution (average EALF per axle):
| Axle load (kN) | % axles | EALF | % x EALF |
|---|---|---|---|
| 10 | 15 | 0.0002 | 0.0000 |
| 30 | 15 | 0.0198 | 0.0030 |
| 50 | 20 | 0.1526 | 0.0305 |
| 70 | 30 | 0.5862 | 0.1759 |
| 90 | 10 | 1.6018 | 0.1602 |
| 110 | 10 | 3.5745 | 0.3574 |
| Total | 100 | 0.7270 |
ESAL per day at present (design lane) . At opening (3 years): per day.
Design ESAL = 32.674
Step 3 - Thickness required over each layer
The AI charts give the thickness of asphalt concrete (full depth) needed to protect a layer of a given modulus for the design ESAL. The same requirement is expressed here as a structural number (AASHTO-93 relation with R = 90 percent, = 0.45, = 1.7), which closely approximates the AI chart readings (if the chart is supplied in the exam, read the thickness from it and use the same layer-coefficient steps below).
| Protected layer | Modulus (MPa) | Required SN | Full-depth AC equivalent at (mm) |
|---|---|---|---|
| bituminous treated base | 1200 | 1.84 | 106 |
| granular sub-base | 125 | 4.36 | 252 |
| Subgrade | 60 | 5.58 | 322 |
Step 4 - Layer coefficients
Using , , with in psi:
- Asphalt concrete (2500 MPa):
- bituminous treated base (1200 MPa):
- granular sub-base (125 MPa):
Step 5 - Layer thicknesses
- Asphalt concrete: mm, so provide 125 mm (minimum 50 mm). .
- Bituminous treated base: mm, so provide 200 mm. .
- Granular sub-base: mm, so provide 230 mm. .
Check: provided (required) - safe.
Answer: asphalt concrete 125 mm, bituminous treated base 200 mm, granular sub-base 230 mm; total pavement thickness = 555 mm.
+-------------------------------------+
| Asphalt concrete 125 mm |
+-------------------------------------+
| Bituminous treated base 200 mm |
+-------------------------------------+
| Granular sub-base 230 mm |
+-------------------------------------+
| Subgrade, CBR 6.0 % |
+-------------------------------------+
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Flexible pavement life with 140 cvpd traffic · Transportation Engineering II, chapter 2
- IRC pavement design: 5640 CVPD, CBR 6% · Transportation Engineering II, chapter 2
- VDF; four-lane flexible design from catalogue · Transportation Engineering II, chapter 2
- Flexible pavement design: four lane, ADT 8000 trucks · Transportation Engineering II, chapter 2
- IRC CBR-method design: 1200 CVPD, 4% subgrade · Transportation Engineering II, chapter 2
- Flexible pavement design with 8 CBR values · Transportation Engineering II, chapter 2
- Setback on four lane carriageway, 400 m radius · Transportation Engineering I, chapter 3
- Total demand, village survey 2013, design 15 years · Water Supply Engineering, chapter 3 · asked 2×