DOD (Depth of Discharge) is the percentage of rated capacity discharged; deeper DOD shortens battery life. Typical station service scheme: unit auxiliary transformer from generator bus feeds unit board; station transformer from HV bus feeds common board; diesel generator provides emergency and black-start supply; essential loads on emergency board.
What is DOD of a battery? Draw the typical schemes of service station.
Depth of discharge (DOD)
Depth of discharge (DOD) is the fraction of a battery's rated capacity that has been taken out, expressed in percent:
It is the complement of the state of charge: . For example, taking 60 Ah from a 200 Ah battery gives a DOD of 30 %.
Importance:
- A deeper DOD shortens battery life (fewer cycles). Lead-acid batteries are usually designed for 50–80 % maximum DOD, Ni-Cd and Li-ion can go deeper.
- Battery sizing for a station uses the allowed DOD and the end-of-discharge voltage (e.g. 1.75–1.8 V/cell for lead-acid).
Station service (auxiliary supply) schemes
Station service supplies the auxiliaries: pumps, cooling, governors, cranes, lighting, battery chargers. Common schemes:
1. Unit auxiliary transformer (UAT) tapped from the generator bus, with station transformer backup
Gen G1 --+-- GSU T1 --+-- HV bus (132 kV)
| |
UAT1 Station service tr (from HV bus)
| |
Unit aux board 1 ----+---- Common station board
|
DG set (standby / black start)
2. Common station service board fed from two sources (main bus and tertiary/grid)
11 kV gen bus --> SST-1 --+
|-- 415 V board --> loads
33/11 kV feeder -> SST-2 -+ (bus coupler)
|
DG set --> Emergency board
|
Battery charger --> DC board
Key features:
- At least two independent sources with automatic changeover (bus coupler).
- An emergency diesel generator for black start and essential loads.
- Unit boards for each generating unit's own auxiliaries, plus a common board for shared loads.
- Essential loads moved to the emergency board; DC system with its own battery for vital loads.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Layout of a medium head Francis station · Power Plant Design, chapter 3 · asked 2×
- Battery charging schemes and most effective · Industrial Power Distribution and Illumination, chapter 9
- Battery backup design with inverter at 48 V · Industrial Power Distribution and Illumination, chapter 9
- Reactor schemes in stations and substations · Power Plant Equipment, chapter 4
- SLI and station batteries and charging methods · Industrial Power Distribution and Illumination, chapter 9