DOD (Depth of Discharge) is the percentage of rated capacity discharged; deeper DOD shortens battery life. Typical station service scheme: unit auxiliary transformer from generator bus feeds unit board; station transformer from HV bus feeds common board; diesel generator provides emergency and black-start supply; essential loads on emergency board.

What is DOD of a battery? Draw the typical schemes of service station.

Depth of discharge (DOD)

Depth of discharge (DOD) is the fraction of a battery's rated capacity that has been taken out, expressed in percent:

DOD=Ah dischargedRated Ah capacity×100 %\text{DOD} = \frac{\text{Ah discharged}}{\text{Rated Ah capacity}} \times 100\,\%

It is the complement of the state of charge: SOC=100 %−DOD\text{SOC} = 100\,\% - \text{DOD}. For example, taking 60 Ah from a 200 Ah battery gives a DOD of 30 %.

Importance:

  • A deeper DOD shortens battery life (fewer cycles). Lead-acid batteries are usually designed for 50–80 % maximum DOD, Ni-Cd and Li-ion can go deeper.
  • Battery sizing for a station uses the allowed DOD and the end-of-discharge voltage (e.g. 1.75–1.8 V/cell for lead-acid).

Station service (auxiliary supply) schemes

Station service supplies the auxiliaries: pumps, cooling, governors, cranes, lighting, battery chargers. Common schemes:

1. Unit auxiliary transformer (UAT) tapped from the generator bus, with station transformer backup

 Gen G1 --+-- GSU T1 --+-- HV bus (132 kV)
          |            |
         UAT1     Station service tr (from HV bus)
          |            |
  Unit aux board 1 ----+---- Common station board
                                  |
                          DG set (standby / black start)

2. Common station service board fed from two sources (main bus and tertiary/grid)

 11 kV gen bus --> SST-1 --+
                           |-- 415 V board --> loads
 33/11 kV feeder -> SST-2 -+   (bus coupler)
                               |
               DG set --> Emergency board
                               |
           Battery charger --> DC board

Key features:

  • At least two independent sources with automatic changeover (bus coupler).
  • An emergency diesel generator for black start and essential loads.
  • Unit boards for each generating unit's own auxiliaries, plus a common board for shared loads.
  • Essential loads moved to the emergency board; DC system with its own battery for vital loads.