- 2078 Bhadra · 6 marks
Volume from central depths 1.85, 2.15, 2.45
Short answer
Using the given centre depths of cut, compute cross-sectional areas for cutting with side slopes 2:1, transverse slope 6:1, formation width 12 m. Trapezoidal volume = 2506.64 m³, prismoidal volume = 2504.61 m³, prismoidal correction = 2.03 m³.
Find the volume by the trapezoidal and prismoidal formula with the following data.
| Chainage (m) | 0 | 30 | 60 |
|---|---|---|---|
| Central depth of cut (m) | 1.85 | 2.15 | 2.45 |
Formation width = 12 m, side slopes = 2:1, transverse slope = 6:1. Also calculate the prismoidal correction.
A two-level section (ground sloping across the road) is used at every chainage. Data: formation width m, side slope (horizontal : vertical), transverse ground slope , section spacing m.
Step 1: Centre heights
The centre depths of cut are given directly: , and m at chainages 0, 30 and 60 m. A cutting is assumed because a depth of cut is given.
Step 2: Cross-sectional areas
Along the cross-section the ground rises on one side and falls on the other. The depths of cut at the two side slope ends (where the side slope meets the ground) are
The horizontal distances from the centre line to these points are and , and the area of the section is
(the triangle between the two side slopes extended and the ground line, minus the triangle below the formation width).
Worked section at chainage 0, m:
| Chainage (m) | h (m) | h₁ (m) | h₂ (m) | d₁ (m) | d₂ (m) | Area A (m²) |
|---|---|---|---|---|---|---|
| 0 | 1.85 | 4.275 | 0.638 | 14.550 | 7.275 | 34.926 |
| 30 | 2.15 | 4.725 | 0.862 | 15.450 | 7.725 | 41.676 |
| 60 | 2.45 | 5.175 | 1.088 | 16.350 | 8.175 | 48.831 |
Step 3: Volume by the trapezoidal formula
Step 4: Volume by the prismoidal formula
Step 5: Prismoidal correction
The trapezoidal formula overestimates the volume by 2.03 m³, so the prismoidal volume is the more accurate one.
Answer: Volume of cutting by the trapezoidal formula = 2506.64 m³; by the prismoidal formula = 2504.61 m³; prismoidal correction = 2.03 m³.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Earthwork volume, formation 1201.85, 1.65 m depth · Surveying I, chapter 9
- Cut and fill volume, 20 m formation width · Surveying I, chapter 9
- Cutting volume, 60 m, GL 1181.50, formation 1179.00 · Surveying I, chapter 9 · asked 8×
- Cutting volume, 60 m, formation level 279.00 · Surveying I, chapter 9 · asked 7×
- Cutting volume, 60 m, formation level 278.00 · Surveying I, chapter 9 · asked 7×
- Cutting volume, 60 m, GL 540.70, formation 538.20 · Surveying I, chapter 9 · asked 7×
- Hill road earthwork, chainage 12-15 · Estimating and Costing, chapter 6
- Seepage through dam with central core (45 m dam) · Hydropower Engineering, chapter 4
- Efficient trapezoid with unequal side slopes · Hydraulics, chapter 6
- Hill road earthwork, chainage 0-600 (12 marks) · Estimating and Costing, chapter 6