- 2073 Bhadra · 5 marks
Locating phase-to-phase cable fault
Short answer
Use the Murray loop test with one sound core. Link the sound core and one faulty core at the far end, connect a Wheatstone bridge with ratio arms P and Q, and apply the battery between P–Q junction and the other faulty core. At balance, fault distance from test end is x = (Q/(P+Q)) × 2L.
Explain one of the techniques to locate phase to phase fault on underground power cable.
A phase-to-phase (short-circuit) fault between two cores of a multi-core cable can be located by the Murray loop test, a Wheatstone bridge method that needs one sound core.
Connections
+--------------(G)--------------+
| |
c ---/\/\------+------/\/\----- a
| P | Q |
| battery |
| | |
| core 2 |
sound core 3 faulty core 1
| x <- fault (core 1 to core 2)
| |
+====== link at far end ========+
- Core 1 and core 2 are shorted together at the fault. Core 3 is sound.
- At the far end, link core 1 to sound core 3 to form a loop.
- Connect ratio arm to the test end c of core 3 and ratio arm to the test end a of core 1, and connect the galvanometer across a and c.
- Connect the battery between the junction of and and core 2 (the other shorted core). Core 2 takes the place of earth in the earth-fault test. Current then flows through the fault into the loop.
- Adjust and for zero galvanometer deflection.
Calculation
Let be the resistance of core 1 from the test end to the fault, and the whole loop resistance (core 1 + core 3). The arm next to is and the arm next to is . At balance:
For cores of equal size and cable length :
Example
A 3 km cable balances at and :
The fault resistance lies in the battery circuit, so it does not affect the balance. The Varley loop test can be used in the same way when fine adjustment by a series resistor is preferred.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cable fault location techniques and Murray loop · Power System Analysis I, chapter 2
- Locating faults in underground cables · Power System Analysis I, chapter 2 · asked 3×
- Murray loop test for cable faults · Power System Analysis I, chapter 2 · asked 5×
- What a power cable is · Power System Analysis I, chapter 2
- Varley loop test for cable faults · Power System Analysis I, chapter 2
- Underground cables vs overhead lines · Power System Analysis I, chapter 2
- Underground cable laying systems · Industrial Power Distribution and Illumination, chapter 3
- Splicing techniques of HV cable · Industrial Power Distribution and Illumination, chapter 3
- Single-phase Cu cable for three loads · Industrial Power Distribution and Illumination, chapter 5
- Aluminium cable for 25 kW single-phase load · Industrial Power Distribution and Illumination, chapter 5