- 2079 Baisakh · 6 marks
Phi-index, excess rainfall hyetograph, runoff volume
Short answer
With φ = 0.40 cm/h, excess depths in successive 2-h periods are 0, 1.4, 1.6, 0.6, 0.1, 0.9, 0 cm. Total excess = 4.60 cm, direct runoff volume = 2.3×10⁵ m³.
A catchment area of 5 km had the following rainfall pattern.
| Time (h) | 0 | 2 | 4 | 6 | 8 | 10 | 12 | 14 |
|---|---|---|---|---|---|---|---|---|
| Cumulative rainfall (cm) | 0 | 0.60 | 2.80 | 5.20 | 6.60 | 7.50 | 9.20 | 9.60 |
If -index is 0.40 cm/hr, construct the excess rainfall hyetograph and also find the volume of direct runoff.
Rainfall in each 2-hour period is the difference of cumulative rainfall; the intensity is depth/2 h. Loss rate cm/h.
| Period (h) | Rain depth (cm) | Intensity (cm/h) | Excess rate = i - 0.40 (cm/h) | Excess depth (cm) |
|---|---|---|---|---|
| 0-2 | 0.6 | 0.3 | 0 (below ) | 0 |
| 2-4 | 2.2 | 1.1 | 0.7 | 1.4 |
| 4-6 | 2.4 | 1.2 | 0.8 | 1.6 |
| 6-8 | 1.4 | 0.7 | 0.3 | 0.6 |
| 8-10 | 0.9 | 0.45 | 0.05 | 0.1 |
| 10-12 | 1.7 | 0.85 | 0.45 | 0.9 |
| 12-14 | 0.4 | 0.2 | 0 (below ) | 0 |
| Total | 9.6 | 4.6 |
Excess rainfall hyetograph: bars of excess depth for 2-h periods (bar heights are labelled, not drawn to scale):
excess (cm)
1.6 | ####
1.4 | #### ####
0.9 | #### #### ####
0.6 | #### #### #### ####
0.1 | #### #### #### #### ####
+-------------------------------------------------
0-2 2-4 4-6 6-8 8-10 10-12 12-14 h
(Bar heights, 2-4 h: 1.40; 4-6 h: 1.60; 6-8 h: 0.60; 8-10 h: 0.10; 10-12 h: 0.90; there is no excess in 0-2 h and 12-14 h.)
Volume of direct runoff:
Answer: Total excess rainfall = 4.60 cm; volume of direct runoff = 2.3 × 10⁵ m³ (0.23 million m³).
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Phi-index and rainfall excess duration, 0.340 Mm3 runoff · Engineering Hydrology, chapter 3 · asked 2×
- Phi-index of storm, 20 cm rain, 12 cm runoff · Engineering Hydrology, chapter 3
- Surface runoff with initial loss and phi-index, 100-min storm · Engineering Hydrology, chapter 3
- Phi-index from runoff volume 92,800 m3 · Engineering Hydrology, chapter 3
- Total rainfall, runoff and peak discharge with phi-index · Engineering Hydrology, chapter 3
- Phi-index and rainfall excess duration from mass curve · Engineering Hydrology, chapter 3
- Sewer diameter for a 12 sq km area · Sanitary Engineering, chapter 3
- Runoff from a 20 ha built-up area · Sanitary Engineering, chapter 2
- Tile drain spacing: rainfall 80 cm · Irrigation and Drainage Engineering, chapter 9 · asked 2×
- Cutting volume, 60 m, GL 540.70, formation 538.20 · Surveying I, chapter 9 · asked 7×