- 2071 Shrawan · 8+6 marks
2-h and 4-h UH from an S-hydrograph
Short answer
Lag the S-curve by2 h and divide the difference by2: the 2-h UH is a rectangle of height0.5 h⁻¹ from0 to2 h. Adding two 2-h UHs lagged by2 h and dividing by2 gives a 4-h UH rectangle of height0.25 h⁻¹ over0–4 h.
An S-hydrograph is given such that at time t = 0, its ordinate is 1 cm/h and it remains so for an indefinite period of time. Determine a 2-hour unit hydrograph. Using this unit hydrograph, determine a 4-hour unit hydrograph.
The S-hydrograph is the response to a continuous net rain of 1 cm/h that continues indefinitely. Here its ordinate is 1 (unit: cm/h of runoff) from t = 0 and stays constant, i.e. for .
(a) 2-hour unit hydrograph
Lag the S-curve by h and subtract. This gives the response to 1 cm/h for 2 h = 2 cm. Divide by = 2 to get a UH for 1 cm:
| t (h) | S(t) | S(t−2) | S(t)−S(t−2) | 2-h UH = difference / 2 |
|---|---|---|---|---|
| 0 | 1 | 0 | 1 | 0.5 |
| 1 | 1 | 0 | 1 | 0.5 |
| 2⁻ (just before) | 1 | 0 | 1 | 0.5 |
| ≥ 2 | 1 | 1 | 0 | 0 |
So the 2-h UH is a rectangle of height 0.5 per hour (cm/h per cm of rain) from t = 0 to t = 2 h, and zero afterwards. Check: area = 0.5 × 2 = 1 cm. ✓.
U (1/h)
0.5 |#########
|#########
0 +---------+--------- t (h)
0 2
(b) 4-hour UH from the 2-hour UH
Add two 2-h UHs, the second lagged by 2 h, and divide by 2 (4 h/2 h = 2 blocks, and the sum is for 2 cm):
| t (h) | U₂(t) | U₂(t−2) | Sum | U₄ = Sum/2 |
|---|---|---|---|---|
| 0 to 2 | 0.5 | 0 | 0.5 | 0.25 |
| 2 to 4 | 0 | 0.5 | 0.5 | 0.25 |
| > 4 | 0 | 0 | 0 | 0 |
Answer: the 4-h UH is a rectangle of height 0.25 per hour from t = 0 to 4 h (area = 0.25 × 4 = 1 cm ✓). The same result comes directly from .
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Flood hydrograph from 4-h UH, 50 m3/s base · Engineering Hydrology, chapter 5 · asked 2×
- Storm hydrograph from 6-h UH, 15 cm storm · Engineering Hydrology, chapter 5 · asked 2×
- Unit hydrograph and UH for multiple storms · Engineering Hydrology, chapter 5 · asked 2×
- Flood hydrograph from 4-h UH, three 2-hr rainfalls · Engineering Hydrology, chapter 5 · asked 2×
- Flood hydrograph from 6-h UH, three storms · Engineering Hydrology, chapter 5
- Flood hydrograph from 2-h UH, 5.2 cm rainfall · Engineering Hydrology, chapter 5
- Device holding time and calls per hour · Telecommunications, chapter 6
- RoR and PRoR from hydrograph equation (Q40) · Hydropower Engineering, chapter 3
- Torsional pendulum time period · Engineering Physics, chapter 1 · asked 2×