For an M/M/1 delay system with average wait W=10 ms. (i) h=50 ms, W = (A h)/(1-A) yields A=1/6; calls/h = A T/h = (1/6)×3600/0.05 = 12,000 calls/h. (ii) λ=5 calls/s, W=0.01 s, solve 5h^2/(1-5h)=0.01 gives h=0.04 s = 40 ms maximum.
A device in a telephone exchange is required to commence operation within an average period of 10 milliseconds after receiving a calling signal. (i) If the device is held, on average for 50 milliseconds per call, how many calls can it handle per hour? (ii) If the device is required to handle 18,000 calls per hour, what is the maximum permissible average holding time?
The device is a single server and calls that find it busy wait (delay system). With random (Poisson) calls and exponential holding time this is an M/M/1 (Erlang delay, N = 1) system. The "10 ms" is the mean delay before a call is served (averaged over all calls):
where = mean holding time and = traffic (occupancy) of the device.
(i) h = 50 ms, W = 10 ms
Calls per hour:
(Without the delay limit, a fully occupied device could take calls/h, but delay would then be infinite.)
(ii) 18000 calls/h, W = 10 ms
calls/s, so (h in seconds).
Check: ; ms.
Answer: (i) 12,000 calls per hour; (ii) maximum average holding time h = 40 ms.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Traffic numerical: 800 calls, 50 lost · Telecommunications, chapter 6 · asked 6×
- Working principle of a digital telephone exchange · Telecommunications, chapter 4 · asked 4×
- Telephone exchange and switching hierarchy · Telecommunications, chapter 1 · asked 3×
- Telephone exchange structure; TST vs STS · Telecommunications, chapter 4
- Traffic numerical: 600 calls, 40 lost, 120 s · Telecommunications, chapter 6 · asked 5×
- Time switch in digital exchange · Telecommunications, chapter 4
- Machine temperature after one hour of heating · Electric Machine Design, chapter 2
- Thyristor V-I, latching/holding, gate signal circuit · Power Electronics, chapter 1
- Air change per hour and effective temperature · Building Technology, chapter 1
- Cycle, period, frequency, average and rms · Basic Electrical Engineering, chapter 5