- 2083 Baishakh (new course) · 3+4 marks
Ybus modified by mid-line tap changer
Short answer
Original Ybus: diagonals 4 - j11.94 pu, off-diagonals -2 + j6 pu. With tap t=1.05 midpoint in line 1-2, Y11=4.0975 - j12.2325, Y22=3.9025 - j11.6475, Y12=Y21= -1.9976 + j5.9929; other elements unchanged.
For the power system network shown below, obtain the bus admittance matrix. The series impedance and shunt half-charging admittance of each line are 0.05 + j0.15 p.u. and j0.03 p.u. respectively. If a tap-changing transformer having turn ratio (t) = 1:1.05 is inserted mid-point between buses 1 and 2, find the modified bus admittance matrix. [Figure: three buses, each with a generator, lines 1-2, 1-3 and 2-3]
(a) Original Ybus
Series admittance of each line:
Half-line charging at each end; each bus has two lines:
(b) With the tap-changing transformer at the mid-point of line 1-2
Assumptions: the ideal transformer (ratio , , "1" on the bus-1 side) has negligible own impedance; the line's series impedance is split into two halves ; the line-charging terms stay at the line ends.
(1)--[ z/2 ]--)|( 1:t --[ z/2 ]--(2)
Referring the bus-1-side half to the t-side multiplies its impedance by , so the transformer branch is an ideal in series with
Using the off-nominal model ( at bus 1, at bus 2, mutual):
Modified elements (only those involving line 1-2 change):
Answer:
The matrix stays symmetric because is real.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Node equations and Ybus, six-bus network · Power System Analysis II, chapter 1
- Ybus for 3-bus lines with shunt susceptance · Power System Analysis II, chapter 1
- Ybus modified by phase-shifting transformer · Power System Analysis II, chapter 1
- Ybus of five-bus system · Power System Analysis II, chapter 1
- Ybus for 3-bus system (2078) · Power System Analysis II, chapter 1
- Ybus for network with three sources · Power System Analysis II, chapter 1
- 150 km line with mid-point shunt capacitor · Power System Analysis I, chapter 6
- Series R, X and shunt admittance from ABCD · Power System Analysis I, chapter 5
- Double-stub shunt tuner for admittance load · RF and Microwave Engineering, chapter 2
- Power by two generators, 1.05∠5° and 1.05∠20° pu · Power System Analysis I, chapter 3 · asked 2×