- Practice · 5 marks
Site investigation for micro hydro plant
Short answer
Site investigation assesses flow, head, geology, access, environment and load. Head measurement methods: water-filled tube with pressure gauge (head from pressure reading), spirit level and measuring stick (step-wise vertical drop), Abney level (height = L sinθ). Dumpy level gives highest accuracy.
Describe the investigations required to select a site for a micro hydropower plant. Explain any three methods of measuring the head of a site.
Site investigation decides whether the available flow and head can be developed safely and cheaply.
Investigations
- Reconnaissance: study of maps and a field walk to find possible intake, canal, forebay and powerhouse positions, and the demand (load) of the nearby village.
- Head measurement: the gross head between the intake water level and the tailrace level.
- Flow measurement: dry-season (minimum) and mean flow, from direct measurement or hydrological estimates.
- Geology and soil: stable slopes, with no landslides or leaking ground along the canal and penstock; foundations for the powerhouse and anchor blocks.
- Layout and cost: length of canal and penstock, access, flood level at the powerhouse, distance to the load.
- Environment and water rights: impact on downstream users and fish, and on irrigation and drinking water needs.
Head measurement methods
- Water-filled tube (pipe) and pressure gauge: a long flexible tube filled with water is laid down the slope; the gauge reading at the lower end gives the head, . For long drops, readings are taken in steps and added.
- Spirit level and measuring stick: a level is used to measure the height difference in successive steps along the slope, and the steps are added. It is cheap and quite accurate for short drops.
- Abney level (clinometer): the slope angle is measured along a measured length , and the height of each step is . It is quick and suits long, steep slopes.
- Altimeter or GPS: readings at the top and bottom give an approximate height difference, with an error of a few metres, so it is used only in the first survey.
- Dumpy level / theodolite: gives the most accurate result in the detailed survey.
The net head is the gross head minus friction and bend losses in the penstock (typically 5–10 % of the gross head).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Micro hydro net head, power and energy · Energy Resources, chapter 5
- Micro hydro scheme components and classification · Energy Resources, chapter 5
- Purposes of site investigation · Engineering Geology II, chapter 4 · asked 7×
- Pre-feasibility vs feasibility; site investigations · Hydropower Engineering, chapter 2
- Pre-feasibility site-specific investigations · Hydropower Engineering, chapter 2
- Methods of surface and subsurface site investigation · Engineering Geology I, chapter 1 · asked 4×