Site investigation assesses flow, head, geology, access, environment and load. Head measurement methods: water-filled tube with pressure gauge (head from pressure reading), spirit level and measuring stick (step-wise vertical drop), Abney level (height = L sinθ). Dumpy level gives highest accuracy.

Describe the investigations required to select a site for a micro hydropower plant. Explain any three methods of measuring the head of a site.

Site investigation decides whether the available flow and head can be developed safely and cheaply.

Investigations

  1. Reconnaissance: study of maps and a field walk to find possible intake, canal, forebay and powerhouse positions, and the demand (load) of the nearby village.
  2. Head measurement: the gross head between the intake water level and the tailrace level.
  3. Flow measurement: dry-season (minimum) and mean flow, from direct measurement or hydrological estimates.
  4. Geology and soil: stable slopes, with no landslides or leaking ground along the canal and penstock; foundations for the powerhouse and anchor blocks.
  5. Layout and cost: length of canal and penstock, access, flood level at the powerhouse, distance to the load.
  6. Environment and water rights: impact on downstream users and fish, and on irrigation and drinking water needs.

Head measurement methods

  • Water-filled tube (pipe) and pressure gauge: a long flexible tube filled with water is laid down the slope; the gauge reading at the lower end gives the head, H=p/(ρg)H = p/(\rho g). For long drops, readings are taken in steps and added.
  • Spirit level and measuring stick: a level is used to measure the height difference in successive steps along the slope, and the steps are added. It is cheap and quite accurate for short drops.
  • Abney level (clinometer): the slope angle θ\theta is measured along a measured length LL, and the height of each step is Lsin⁡θL\sin\theta. It is quick and suits long, steep slopes.
  • Altimeter or GPS: readings at the top and bottom give an approximate height difference, with an error of a few metres, so it is used only in the first survey.
  • Dumpy level / theodolite: gives the most accurate result in the detailed survey.

The net head is the gross head minus friction and bend losses in the penstock (typically 5–10 % of the gross head).