- Asked 4/20
- 2078 Chaitra · 12 marks
Factory hall 55.75 m × 40.25 m LED lighting
Short answer
390 LED panels of 30 W (3000 lm each) in a 26×15 grid, spacing 2.14 m × 2.68 m, achieving 250.3 lux with UF=0.8, MF=0.6, and 100 lm/W. Total lighting load 11.7 kW, supplied by a 25 A TPN MCB.
A factory hall size of 55.75m×40.25m is to be illuminated by LED panel of 30W. Inside hall, an average illumination of 250 lum/m² is to be provided on the working plane. The walls and ceiling are brightly painted. Calculate number of luminaries required to be fitted in the hall. Draw layout diagram showing arrangement of luminaries, switches, and distribution board. Decide the light sub-circuits and the supply is 400V, 3-phase, 4 wire system. Assume value for utilization and maintenance factor are 0.8 and 0.6 respectively, the lamp efficiency is 100 lum/watt.
Given: hall 55.75 m × 40.25 m, E = 250 lux (lm/m²), 30 W LED panel at 100 lm/W, UF = 0.8, MF = 0.6, supply 400 V, 3-phase, 4-wire. Assumptions: mounting height 3 m above the working plane, maximum spacing-to-height ratio 1.5, LED driver pf 0.9.
Number of luminaires
Lumen method: N = (E × A) / (φ × UF × MF), where φ is the output of one luminaire.
Area A = 55.75 × 40.25 = 2243.938 m²
φ per luminaire = 30 W × 100 lm/W = 3000 lm
Total lumens = E × A / (UF × MF)
= 250 × 2243.938 / (0.8 × 0.6)
= 1168717 lm
N = 1168717 / 3000 = 389.57
Rounding up and fitting a regular grid: 26 × 15 = 390 luminaires (26 along the 55.75 m side, 15 along the 40.25 m side).
Arrangement and spacing
Spacing along length = 55.75/26 = 2.14 m
Spacing along width = 40.25/15 = 2.68 m
End spacing (to wall) = half of these
Max spacing = SHR × Hm = 1.5 × 3 = 4.5 m
2.14 m and 2.68 m ≤ 4.5 m → OK
Actual E = 390 × 3000 × 0.8 × 0.6 / 2243.938
= 250.3 lux (≥ 250 lux required)
Layout diagram
Plan 55.75 m × 40.25 m (o = luminaire)
+---------------------------------------------+
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
| : |
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
| o o o o o o o o o o ... o o o o o o o o o o |
+---------------------------------------------+
[DB] [SB] <- entrance: DB and switch board
S S S S ... one switch per sub-circuit
Each light sub-circuit is controlled by one 6 A one-way switch; all switches are grouped on a switch board (SB) next to the entrance, and the DB is mounted beside it.
Sub-circuits
Rule (IS 732 / NEA practice): a light sub-circuit carries at most 10 points and 800 W. Here one luminaire is 30 W, so up to 10 luminaires per sub-circuit. Number of circuits is made a multiple of 3 for phase balance.
| Phase | Light circuits | Luminaires | Load (W) |
|---|---|---|---|
| R | 13 | 130 | 3900 |
| Y | 13 | 130 | 3900 |
| B | 13 | 130 | 3900 |
Largest light circuit: 300 W → I = 300/(230 × 0.9) = 1.45 A → 6 A MCB, 1.5 mm² Cu.
Distribution board design
| Phase | Circuits | Load (W) | Current (A) |
|---|---|---|---|
| R | 13 circuits | 3900 | 18.84 |
| Y | 13 circuits | 3900 | 18.84 |
| B | 13 circuits | 3900 | 18.84 |
Total connected load = 11700 W (lighting)
Most loaded phase = 3900 W
Iph = 3900 / (230 × 0.9) = 18.84 A
Main MCB ≥ 1.25 × 18.84 = 23.55 A → 25 A TPN MCB
DB specification: 16-way-per-phase TPN DB (48 ways in all, spares included) with 25 A TPN MCB as incomer, 25 A 4-pole RCCB (100 mA) for earth-leakage protection, 6 A SP MCBs (B-curve) for light circuits. Incoming cable: 4-core 2.5 mm² Cu PVC (rating 27 A ≥ 25 A), plus earth continuity conductor.
3-phase, 400/230 V, 4-wire supply
|
[Energy meter]
|
[25 A TPN MCB]
|
[25 A 4P RCCB]
|
==R====Y====B====N== busbars
| | | | |
L1 L2 L3 L4 L5 ...
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Hall 16 × 12 m LED lighting · Industrial Power Distribution and Illumination, chapter 7 · asked 4×
- Factory hall 15 × 12 m metal halide lighting · Industrial Power Distribution and Illumination, chapter 7 · asked 4×
- Production room 27 × 45 m twin 36 W tubes · Industrial Power Distribution and Illumination, chapter 7 · asked 4×
- Drawing hall 40 × 25 × 6 m, 250 lux LED · Industrial Power Distribution and Illumination, chapter 7 · asked 3×
- Industrial shop 30 × 25 m LED lighting · Industrial Power Distribution and Illumination, chapter 7
- Drawing hall 40 × 25 × 6 m, 90 lm/m² LED · Industrial Power Distribution and Illumination, chapter 7 · asked 2×
- Drawing hall 40 × 20 × 6 m lighting design · Industrial Power Distribution and Illumination, chapter 7 · asked 2×
- Department store 36 × 15 m LED panel lighting · Industrial Power Distribution and Illumination, chapter 7 · asked 3×
- Drawing hall 40 × 25 × 6 m, 2×36 W fluorescent · Industrial Power Distribution and Illumination, chapter 7
All Industrial Power Distribution and Illumination chapter 7 questions →