Industrial shop 30 × 25 m LED lighting

Short answer

Mounting height 3 m. Using UF=0.7, MF=0.8: N = (150 ×750) / (4000 ×0.56) =50.2 →54 luminaires arranged 9 ×6. Distribution board: 32 A TPN MCB incomer, 40 A RCCB, six 6 A SP lighting circuits, six 20 A power circuits.

An Industrial shop of size 30m x 25m is to be illuminated using 40W LED lamps. Inside the hall an average illumination of 150 lumen/m² is to be provided on the working plane. The walls and ceilings are brightly painted. Calculate the number of luminaries required to be fitted in the hall. Draw layout diagram showing arrangement of luminaries, switches, power sockets. Design the distribution board to supply lighting and power load if the supply is 3 phase, 400 V, 50 Hz. Assume suitable value for utilization and maintenance factor and take lamp efficiency as 100 lumen/watt.

Given: shop 30 m × 25 m, E = 150 lm/m², 40 W LED lamp at 100 lm/W, supply 400 V, 3-phase, 50 Hz. Assumptions: walls and ceiling brightly painted → UF = 0.7, clean industrial area → MF = 0.8; mounting height 3 m above working plane, SHR ≤ 1.5; pf 0.9; 12 power sockets of 16 A (1 kW each).

Number of luminaires

Lumen method: N = (E × A) / (φ × UF × MF), where φ is the output of one luminaire.

Area A        = 30 × 25 = 750 m²
φ per luminaire = 40 W × 100 lm/W = 4000 lm
Total lumens  = E × A / (UF × MF)
              = 150 × 750 / (0.7 × 0.8)
              = 200893 lm
N             = 200893 / 4000 = 50.22

Rounding up and fitting a regular grid: 9 × 6 = 54 luminaires (9 along the 30 m side, 6 along the 25 m side).

Arrangement and spacing

Spacing along length = 30/9 = 3.33 m
Spacing along width  = 25/6 = 4.17 m
End spacing (to wall) = half of these
Max spacing = SHR × Hm = 1.5 × 3 = 4.5 m
3.33 m and 4.17 m ≤ 4.5 m  → OK
Actual E = 54 × 4000 × 0.7 × 0.8 / 750
         = 161.3 lux (≥ 150 lux required)

Layout diagram

Plan 30 m × 25 m (letter = phase of lamp circuit)
+-------------------+
| R R R R R R R R R |
| Y Y Y Y Y Y Y Y Y |
| B B B B B B B B B |
| R R R R R R R R R |
| Y Y Y Y Y Y Y Y Y |
| B B B B B B B B B |
+-------------------+
[DB]  [SB]  <- entrance: DB and switch board
       S S S S ... one switch per sub-circuit

Each light sub-circuit is controlled by one 6 A one-way switch; all switches are grouped on a switch board (SB) next to the entrance, and the DB is mounted beside it. Power sockets (16 A, 3-pin, with earth) are placed along the walls at about 1 m height, spaced roughly evenly.

Sub-circuits

Rule (IS 732 / NEA practice): a light sub-circuit carries at most 10 points and 800 W. Here one luminaire is 40 W, so up to 10 luminaires per sub-circuit. Number of circuits is made a multiple of 3 for phase balance.

CircuitLuminairesLoad (W)Current (A)PhaseMCB
L193601.74R6 A
L293601.74Y6 A
L393601.74B6 A
L493601.74R6 A
L593601.74Y6 A
L693601.74B6 A

Power sub-circuits (assumed): 12 sockets of 16 A, each taken as 1 kW, at most 2 sockets per power sub-circuit (IS 732), 2.5 mm² Cu wire, 20 A MCB.

CircuitSocketsLoad (W)PhaseMCB
P122000R20 A
P222000Y20 A
P322000B20 A
P422000R20 A
P522000Y20 A
P622000B20 A

Distribution board design

PhaseCircuitsLoad (W)Current (A)
RL1, L4, P1, P4472022.8
YL2, L5, P2, P5472022.8
BL3, L6, P3, P6472022.8
Connected load = 2160 W light + 12000 W power = 14160 W
Most loaded phase    = 4720 W
Iph = 4720 / (230 × 0.9) = 22.8 A
Main MCB ≥ 1.25 × 22.8 = 28.5 A → 32 A TPN MCB

DB specification: 6-way-per-phase TPN DB (18 ways in all, spares included) with 32 A TPN MCB as incomer, 40 A 4-pole RCCB (100 mA) for earth-leakage protection, 6 A SP MCBs (B-curve) for light circuits and 20 A SP MCBs for power circuits. Incoming cable: 4-core 6 mm² Cu PVC (rating 45 A ≥ 32 A), plus earth continuity conductor.

3-phase, 400/230 V, 4-wire supply
        |
   [Energy meter]
        |
   [32 A TPN MCB]
        |
   [40 A 4P RCCB]
        |
==R====Y====B====N== busbars
  |    |    |    |    |
  L1   L2   L3   P1   P2  ...