Design steps: collect hydraulic data, compute waterway via Lacey's perimeter and discharge intensity, set crest level from flood routing and canal FSL, find scour depth, determine downstream floor level and length using hydraulic jump conjugate depth, fix total floor length and cutoff depths via Bligh/Khosla, calculate floor thickness from uplift pressure, and provide protection aprons.
Write down the design procedure of sloping glacis weir bay in a typical diversion headworks (crest level, d/s floor level and length, total length of floor, cutoff depth and thickness of floor).
Design of the weir bay of a sloping-glacis weir (Garg / Punmia style).
Step 1: Data. Maximum flood , HFL, pond level (PL), river bed levels, silt factor , afflux, safe exit gradient.
Step 2: Waterway and discharge intensity. Total waterway (from Lacey's perimeter, ), less the width of the undersluices and piers, gives the weir bay length. Discharge per metre .
Step 3: Crest level. Fixed from the pond level and head required to pass the design flood over the crest: (crest level HFL after afflux ); also crest canal FSL regulator losses.
Step 4: Regime (scour) depth. .
Step 5: Downstream floor level and length.
- Total energy (u/s TEL) (d/s bed or floor level); (u/s TEL d/s TEL) and use Blench's curves (or Crump's) to find (the conjugate depth after the jump) for the given and .
- d/s floor level d/s HFL (d/s depth required for the jump) TWL (with a safety margin of 0.5-1 m).
- Length of the horizontal floor (about height of jump) – the glacis length is included with a slope of 3:1.
Step 6: Total length of floor and cutoffs.
- Total length from Bligh's/Khosla's criterion: Bligh with = max static head; or by Khosla's exit gradient.
- U/s cutoff depth - below u/s HFL; d/s cutoff depth - below the d/s bed.
Step 7: Thickness of impervious floor. Check Khosla's pressure at key points and take the thickness
at the toe of the glacis (max thickness), provide about 0.6 m at the ends. Taper thickness along the floor. The d/s floor under the jump should also resist the dynamic forces.
Step 8: Protection works. U/s and d/s aprons (blocks and inverted filter) with launching aprons of length - scour depth; and check exit gradient safe value.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Diversion weir: Bligh and Khosla, 4000 m3/s · Irrigation and Drainage Engineering, chapter 5
- Uplift at inside corners, 50 m floor weir · Irrigation and Drainage Engineering, chapter 5 · asked 2×
- Khosla: barrage HGL and floor thickness · Irrigation and Drainage Engineering, chapter 5
- Glacis fall: crest, cistern, HGL; Q 118 · Irrigation and Drainage Engineering, chapter 7
- Weir waterway and crest levels, 16000 m3/s · Irrigation and Drainage Engineering, chapter 5
- Components and layout of diversion headworks · Irrigation and Drainage Engineering, chapter 5 · asked 2×
- Rigid pavement thickness by IRC procedure · Transportation Engineering II, chapter 2
- Tangential tacheometry, total station procedure · Surveying II, chapter 2
- Stream flow from weir and float measurements · Energy Resources, chapter 5
- Resistance of alloy sheet along length and thickness · Basic Electrical Engineering, chapter 1
All Irrigation and Drainage Engineering chapter 5 questions →