- Asked 2/34
- 2073 Magh · 8 marks
Vertical drop design, Q 1.8 m3/s (drop 0.75 m)
Short answer
Crest length 1.20 m, crest level 106.17 m, head 0.87 m. Wall bottom width 1.43 m. Cistern depth 0.30 m, length 4.83 m. Floor thickness 0.65 m near wall tapering to 0.30 m.
Design a vertical drop structure for the data given below. Full supply discharge u/s and d/s = 1.8 cumecs; Drop height = 0.75 m; FSL u/s and d/s = 106.997 and 106.247; Full Supply depth u/s and d/s = 0.929 m; Bed levels u/s and d/s = 106.068 and 105.318; Bed width u/s and d/s = 1.2 m. Top width of crest = 0.5 m for initial assumption, Cd = 0.415 for rectangular crest. The drop structure is of masonry with specific gravity 2.0. Side slope of the canal is 1:1. The Bligh's coefficient as 6.0 for sandy loam soil at foundation.
Given data and assumptions
- m³/s, bed width m, side slope 1:1, u/s FSL m, u/s bed m, d/s bed m.
- Full supply depth u/s m, d/s m (d/s FSL m); drop in water level m.
- Bligh's coefficient ; specific gravity of masonry .
1. Upstream flow conditions
2. Crest length, head and crest level
Discharge over a rectangular crest: with , where is the total head over the crest (including ). Take crest length equal to the bed width, :
Height of crest above d/s bed m.
3. Cistern (energy dissipation)
Discharge per metre length of crest m²/s. Energy available above the d/s bed m. For a cistern of depth below the d/s bed, the jump must form with the conjugate depth equal to the tail water over the cistern, . Solving with and :
- Required m. Provide m (cistern floor level m).
- With this : m, , m.
Length of cistern (hydraulic jump length) m.
4. Crest (drop) wall
Top width (assumed) m; check m m, so it is adequate. Height of wall from cistern floor to crest m. Bottom width for a gravity masonry wall:
Adopt bottom width m (not less than the top width), with the d/s face vertical or slightly battered.
5. Length of impervious floor (Bligh's theory)
Total creep length required m. Cut-offs: u/s m, d/s m. Downstream floor length (Bligh) with in m²/s:
The d/s floor (measured from the toe of the wall) must also contain the cistern, so adopt m. Creep already provided by cut-offs and wall m, so the u/s floor needed is
Bligh's creep is already satisfied, so a nominal u/s floor of 1.0 m is provided. Actual creep m m, safe. Total floor length m.
6. Thickness of the floor
Pressure head at the toe of the wall: creep to that point m, so residual head m. At the end of the cistern the creep is 8.46 m and m.
Adopt floor thickness 0.65 m under the cistern near the wall, tapering to 0.30 m at the end of the floor (minimum 0.30 m).
Summary
| Component | Value |
|---|---|
| Crest level | 106.17 m |
| Crest length / head | 1.20 m / 0.87 m |
| Crest wall top / bottom width | 0.50 m / 1.43 m |
| Cistern depth / length | 0.30 m / 4.83 m |
| Floor: u/s 1.0 m, d/s 4.83 m, cut-offs 0.6 / 0.9 m | total creep 10.26 m |
| Floor thickness | 0.65 m (taper to 0.30 m) |
Answer: crest level 106.17 m, crest length 1.20 m, crest wall 0.50 m top and 1.43 m bottom width, cistern depth 0.30 m and length 4.83 m, floor length 7.26 m, floor thickness 0.65 m.
Sketch:
FSL u/s ~~~~~~~~~~~|
| crest
u/s bed ___________|__ FSL d/s ~~~~
| u/s floor | \ drop ~~~~~
d1 | | \_____cistern________ d/s bed
| |<-Lc->| d/s floor | d2
|____ floor thickness __|
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Crest width, cistern length of vertical drop, Q 1.55 · Irrigation and Drainage Engineering, chapter 7 · asked 2×
- Vertical drop design, Q 1.8 m3/s (bed 205.05) · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Vertical drop design, Q 7.5 m3/s · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Vertical drop design, Q 5.2 m3/s · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Vertical drop design, Q 2.1 m3/s · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Vertical drop design, Q 5.1 m3/s · Irrigation and Drainage Engineering, chapter 7
- Canal drop structure, Q 5, FSL 110.5 · Irrigation and Drainage Engineering, chapter 7
- Irrigation canal earthwork with vertical drop · Estimating and Costing, chapter 6
All Irrigation and Drainage Engineering chapter 7 questions →