- 2078 Chaitra · 8 marks
Vertical drop design, Q 5.1 m3/s
Short answer
Crest level is 255.15 m with a length of 2.5 m. The drop wall has a top width of 0.5 m and bottom width of 1.52 m. The impervious floor total length is 8.10 m with a thickness of 0.50 m near the wall.
Design a vertical type drop structure for the following data: Discharge = 5.1 m³/sec; Bed level U/S = 255.15 m, D/S = 254.45 m; Normal flow depth U/S, D/S = 0.95 m; Bed width of canal U/S, D/S = 2.5 m; Side slope of canal = 1:1. Take the top width of crest wall as 0.5 m for initial assumption. Assume other suitable data if necessary.
Given data and assumptions
- m³/s, bed width m, side slope 1:1, u/s bed m, d/s bed m.
- U/s FSL bed normal depth m; d/s FSL m. Full supply depth m; drop in water level m.
- Assumed (not given): Bligh's coefficient (sandy loam soil), specific gravity of masonry , and for a rectangular crest.
1. Upstream flow conditions
2. Crest length, head and crest level
Discharge over a rectangular crest: with , where is the total head over the crest (including ). Take crest length equal to the bed width, :
Height of crest above d/s bed m.
3. Cistern (energy dissipation)
Discharge per metre length of crest m²/s. Energy available above the d/s bed m. For a cistern of depth below the d/s bed, the jump must form with the conjugate depth equal to the tail water over the cistern, . Solving with and :
- Required m. Provide m (cistern floor level m).
- With this : m, , m.
Length of cistern (hydraulic jump length) m.
4. Crest (drop) wall
Top width (assumed) m; check m m, so it is adequate. Height of wall from cistern floor to crest m. Bottom width for a gravity masonry wall:
Adopt bottom width m (not less than the top width), with the d/s face vertical or slightly battered.
5. Length of impervious floor (Bligh's theory)
Total creep length required m. Cut-offs: u/s m, d/s m. Downstream floor length (Bligh) with in m²/s:
The d/s floor (measured from the toe of the wall) must also contain the cistern, so adopt m. Creep already provided by cut-offs and wall m, so the u/s floor needed is
Bligh's creep is already satisfied, so a nominal u/s floor of 1.0 m is provided. Actual creep m m, safe. Total floor length m.
6. Thickness of the floor
Pressure head at the toe of the wall: creep to that point m, so residual head m. At the end of the cistern the creep is 9.30 m and m.
Adopt floor thickness 0.50 m under the cistern near the wall, tapering to 0.30 m at the end of the floor (minimum 0.30 m).
Summary
| Component | Value |
|---|---|
| Crest level | 255.15 m |
| Crest length / head | 2.50 m / 1.07 m |
| Crest wall top / bottom width | 0.50 m / 1.52 m |
| Cistern depth / length | 0.50 m / 5.58 m |
| Floor: u/s 1.0 m, d/s 5.58 m, cut-offs 0.6 / 0.9 m | total creep 11.10 m |
| Floor thickness | 0.50 m (taper to 0.30 m) |
Answer: crest level 255.15 m, crest length 2.50 m, crest wall 0.50 m top and 1.52 m bottom width, cistern depth 0.50 m and length 5.58 m, floor length 8.10 m, floor thickness 0.50 m.
Sketch:
FSL u/s ~~~~~~~~~~~|
| crest
u/s bed ___________|__ FSL d/s ~~~~
| u/s floor | \ drop ~~~~~
d1 | | \_____cistern________ d/s bed
| |<-Lc->| d/s floor | d2
|____ floor thickness __|
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Vertical drop design, Q 1.8 m3/s (bed 205.05) · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Vertical drop design, Q 7.5 m3/s · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Vertical drop design, Q 5.2 m3/s · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Vertical drop design, Q 2.1 m3/s · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Vertical drop crest level and width, Q 30 · Irrigation and Drainage Engineering, chapter 7
- Vertical drop design, Q 1.8 m3/s (drop 0.75 m) · Irrigation and Drainage Engineering, chapter 7 · asked 2×
- Irrigation canal earthwork with vertical drop · Estimating and Costing, chapter 6
- Bed slope for critical normal depth · Hydraulics, chapter 7
- Normal depth in compound channel · Hydraulics, chapter 6
- Canal earthwork, bed 3 m, free board 0.44 m · Estimating and Costing, chapter 6
All Irrigation and Drainage Engineering chapter 7 questions →