- 2075 Baisakh · 8 marks
Degree of treatment, city 1200 l/s
Short answer
Mixing gives initial deficit 2.51 mg/L. Permissible critical deficit is 5.17 mg/L (to maintain DO ≥4 mg/L). Trial solution yields maximum permissible mixture ultimate BOD 23.87 mg/L. Sewage ultimate BOD must be reduced from 234 mg/L to 111.12 mg/L, requiring 52.5% treatment efficiency.
A city discharges sewage at the rate of 1200 l/s, into a stream whose minimum flow is 5000 liters/sec, the temperature of both being 20°C. The 5 day BOD at 20°C for sewage is 160 mg/l and that of river water is 2 mg/l. The DO content of sewage is zero while that of stream is 90% of the saturation DO. Find out the degree of treatment required if the minimum DO to be maintained in the stream is 4 mg/lit. Assume deoxygenation coefficient as 0.10 (base 10) and re-oxygenation coefficient as 0.30 (base 10). Given saturation DO at 20°C as 9.17 mg/lit.
Flows are in m³/s (, ). River DO mg/l; sewage DO ; the temperature is 20°C so mg/l.
Step 1: Mixing and permissible deficit
Step 2: Permissible BOD of the mixture
With and (base 10), . The critical deficit is
and must not exceed 5.17 mg/l. Solving these two equations for by trial (with fixed) gives mg/l, with days (check: mg/l).
Step 3: Permissible BOD of the effluent
So the treated effluent can have mg/l.
Answer: the sewage BOD5 must be reduced from 160 mg/l to about 75.98 mg/l, i.e. a treatment efficiency of about 52.5%.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Degree of treatment, town with dairy and industries · Sanitary Engineering, chapter 6
- Degree of treatment, domestic + industrial · Sanitary Engineering, chapter 6
- Temperature effect on BOD; 5-day BOD · Sanitary Engineering, chapter 5
- 1-day BOD 300 mg/l to 5-day at 30°C · Sanitary Engineering, chapter 5
- Degree of treatment, industrial wastewater · Sanitary Engineering, chapter 6
- Is treatment necessary? Industry near river · Sanitary Engineering, chapter 6
- River crossing: minimum clearance above water · Transmission and Distribution System Design, chapter 4
- Super chlorination; overflow rate 5000 L/m2/h · Water Supply Engineering, chapter 6 · asked 2×
- Service reservoir capacity, 10,000 m3/day city · Water Supply Engineering, chapter 7
- Rural area 22000 L/day river supply (question text cut) · Water Supply Engineering, chapter 7