- Asked 2/21
- 2081 Baishakh · 4 marks
- 2073 Shrawan · 3 marks
Forebay design procedure
Short answer
Volume V = Q·t (t≈2–3 min). Area A = Q/v with v ≤ 0.3 m/s. Depth H = S + D + clearance; submergence S = C·Vp·√D (C=0.5434 symmetrical, 0.7245 asymmetrical). Width B = A/H, length L = V/A (L/B~2–4). Spillway Q = C·L·h^(3/2) with C≈1.7 for full turbine flow. Freeboard and flushing gate.
Describe the design procedure of a forebay (write the procedure to compute the dimensions of the forebay and the equations used for such purpose) with a neat sketch.
A forebay is a small reservoir at the end of the headrace (canal or tunnel) from which the penstock takes off. It stores water to meet sudden load demand, provides the transition from open-channel flow to pressure flow, and provides a place for the trash rack, the spillway and sediment flushing.
Design procedure
- Decide the discharge and retention time: = turbine discharge; the retention time is usually 2-3 minutes at full load.
- Volume of storage:
- Cross-section: limit the velocity in the forebay to m/s, so that sediment settles and the flow is calm:
- Water depth from the submergence of the penstock intake:
- velocity in the penstock, ( = number of penstocks)
- Gordon's formula ( for a symmetrical approach and 0.7245 for an asymmetrical approach)
- depth bottom clearance (0.3-0.5 m)
- Width and length: and (check that is large enough, around 2-4, with a gradual expansion from the headrace).
- Spillway: to pass the full design discharge when the turbines trip, with for a broad crest and m.
- Free board (0.5 m), a bottom slope towards a flushing gate, a trash rack at the intake and an air vent behind the penstock gate.
- Check the entrance loss, and set the top of the forebay wall at full supply level + surge + free board.
Sketch
PLAN
headrace ====> \ forebay /|==> penstock
transition| rack |
====> / |==> penstock
spillway | flush gate
v to river
SECTION
FSL ~~~~~~~~~~~~~~~~~~~~~~~~~~
| S |rack|gate
| |####| ___ penstock crown
bed |_____________|####|_/ D
0.5 m clearance
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Forebay design considerations; design for 12 m³/s · Hydropower Engineering, chapter 6
- Forebay design with spillway length (14 m³/s) · Hydropower Engineering, chapter 6
- Forebay design (14.5 m³/s, two penstocks) · Hydropower Engineering, chapter 6
- Forebay design (20 m³/s, 300 m penstock) · Hydropower Engineering, chapter 6
- Forebay design (15 m³/s, 4 minutes) · Hydropower Engineering, chapter 6
- Forebay dimension for 3 minutes storage · Hydropower Engineering, chapter 6
- Grit chamber: purpose, construction, design · Sanitary Engineering, chapter 7 · asked 4×
- VIP latrine: working and design procedure · Sanitary Engineering, chapter 9 · asked 2×
- Design procedure of steel purlin · Design of Steel and Timber Structure, chapter 8 · asked 2×
- Street lighting scheme design procedure · Industrial Power Distribution and Illumination, chapter 8