Forebay design procedure

Short answer

Volume V = Q·t (t≈2–3 min). Area A = Q/v with v ≤ 0.3 m/s. Depth H = S + D + clearance; submergence S = C·Vp·√D (C=0.5434 symmetrical, 0.7245 asymmetrical). Width B = A/H, length L = V/A (L/B~2–4). Spillway Q = C·L·h^(3/2) with C≈1.7 for full turbine flow. Freeboard and flushing gate.

Describe the design procedure of a forebay (write the procedure to compute the dimensions of the forebay and the equations used for such purpose) with a neat sketch.

A forebay is a small reservoir at the end of the headrace (canal or tunnel) from which the penstock takes off. It stores water to meet sudden load demand, provides the transition from open-channel flow to pressure flow, and provides a place for the trash rack, the spillway and sediment flushing.

Design procedure

  1. Decide the discharge and retention time: QQ = turbine discharge; the retention time tt is usually 2-3 minutes at full load.
  2. Volume of storage: V=Q tV=Q\,t
  3. Cross-section: limit the velocity in the forebay to v≤0.2−0.3v\le0.2-0.3 m/s, so that sediment settles and the flow is calm: A=Q/vA=Q/v
  4. Water depth from the submergence of the penstock intake:
    • velocity in the penstock, Vp=Qn π4D2V_p=\dfrac{Q}{n\,\frac{\pi}{4}D^2} (nn = number of penstocks)
    • Gordon's formula S=C VpDS=C\,V_p\sqrt D (C=0.5434C=0.5434 for a symmetrical approach and 0.7245 for an asymmetrical approach)
    • depth H=S+D+H=S+D+ bottom clearance (0.3-0.5 m)
  5. Width and length: B=AHB=\dfrac{A}{H} and L=VAL=\dfrac{V}{A} (check that L/BL/B is large enough, around 2-4, with a gradual expansion from the headrace).
  6. Spillway: to pass the full design discharge when the turbines trip, Q=C Ls h3/2Q=C\,L_s\,h^{3/2} with C≈1.7C\approx1.7 for a broad crest and h=0.3−0.5h=0.3-0.5 m.
  7. Free board (0.5 m), a bottom slope towards a flushing gate, a trash rack at the intake and an air vent behind the penstock gate.
  8. Check the entrance loss, and set the top of the forebay wall at full supply level + surge + free board.

Sketch

PLAN
 headrace ====> \  forebay  /|==> penstock
        transition| rack     |
 ====>           /           |==> penstock
              spillway  |  flush gate
                        v to river

SECTION
 FSL ~~~~~~~~~~~~~~~~~~~~~~~~~~
      |      S      |rack|gate
      |             |####|  ___ penstock crown
 bed  |_____________|####|_/ D
        0.5 m clearance